Validity

This document is intended for qualified persons.  The activities described here must only be carri

-

ed out by persons with the following minimum qualifications:

• 

Training in the installation and commissioning of electrical devices

• 

Training with respect to electrical hazards and locally applicable safety requirements

• 

Knowledge of the applicable standards and directives

• 

Familiarity and compliance with this document and all safety instructions.

Intended use

The Phase Splitter is an add-on installation 
kit  to be used for installations in which the 
single-phase house connection cables have a 
diameter greater than 16mm² and/or an inco-

ming current larger than 63A. The installation 
of the Phase Splitter is only to be used in com-
bination with installation instructions for the 
 SOLARWATT AC Sensor 63.

Safety instructions

• 

To ensure that the cross-section of an in-
coming cable is not undershot, all 3 cables 
supplied must be connected.

• 

The phase splitter must not be used with 
incoming cables with a cross-section lar-
ger than 30 mm².

• 

If the cables supplied are too short for your 
arrangement of the clamps and ACS63, ca-

bles  must  be  custom  made  which  fulfill 

the following criteria:

 

- Same length, same cross-section, same 

material

 

- Wire end ferrules, if necessary accor-

ding to local installation instructions

• 

The installer is responsible for correct in-
stallation

• 

Only the connections described in the in-
structions may be made. Do not connect 
other cables to the free terminals..

 Technical data for the potential collector

You can find further technical data on the potential collection terminals from PhoenixContact at 

www.phoenixcontact.com under the material number 3213142.

Number of poles

1

Number of connections

5

Potentials

1

Nominal cross section

70 mm²

Rated current IN

189 A
(due to the maximum measuring current of AC 
Sensor 63)

PAGE 4 |  Version: 05/2017 | Rev. 000 | AZ-TM-PME-1125 | Subject to change | © 2017 SOLARWATT GmbH 

Summary of Contents for AZ-TM-PME-1125

Page 1: ...PHASE SPLITTER INSTALLATION GUIDE EN PHASE SPLITTER INSTALLATION GUIDE...

Page 2: ...PAGE 2 Version 05 2017 Rev 000 AZ TM PME 1125 Subject to change 2017 SOLARWATT GmbH...

Page 3: ...rnally visible damage Contact your specialist dealer in case of an incomplete delivery or damage 3x Wire bridges 10 mm2 60 cm 2x Potential collector terminal 1x Installation guide Version 05 2017 Rev...

Page 4: ...ion of an in coming cable is not undershot all 3 cables supplied must be connected The phase splitter must not be used with incoming cables with a cross section lar ger than 30 mm If the cables suppli...

Page 5: ...reater than 16mm and or an in coming current larger than 63A 6 1 AC Sensor 63 ACS 63 MyReserve CAN communication B Energy Manager CAN communication C Feeds for external conductors current measurement...

Page 6: ...nd installation IMPORTANT Observe the 5 safety rules The AC Sensor 63 must be installed between the utility meter and the fuse box PAGE 6 Version 05 2017 Rev 000 AZ TM PME 1125 Subject to change 2017...

Page 7: ...mounting rail in the main fuse box or in a separate housing Wire the components according to the following connection dia gram Make sure that you clamp the terminals L1 L2 and L3 A Version 05 2017 Re...

Page 8: ...please use the service hotline We will need the following information to assist you further Type and serial number of the ACS can be read on the type plate Type and serial number of the device receiv...

Reviews: