![Solartron Metrology BLOCK GAUGE User Manual Download Page 5](http://html1.mh-extra.com/html/solartron-metrology/block-gauge/block-gauge_user-manual_1314063005.webp)
Part No. 502924 Issue 5
5
3.0: Mechanical Installation (continued)
.3.0: Mechanical Installation
3.1: Tool Holder Installation/Adjustment
The tool holder is infinitely adjustable along the
industry standard dovetail fitting on the Block Gauge
frame. This dovetail fitting ensures that the gauge is
rigid yet easy to install and adjust.
Tool Holder Adjustment
1. Loosen the caphead screw (11) located on the
tool holder (7) using a 3 mm Allen key.
2. Slide the tool holder to the required position.
3. Tighten the screw.
CAUTION
In order to avoid damage to the linear
bearings, it is important not to exceed
the specification for the torque setting
(1.5 to 2 Nm) of the fixing screw when
adjusting the tool holder.
Tool Holder Installation
To remove the tool holder (7), loosen the caphead
screw (11) located on the tool holder using a 3 mm
Allen key. Slide the tool holder off the dovetail.
To re-install the tool holder, simply slide it over
the dovetail joint to the required position and then
tighten the caphead screw.
Caphead Screw (11)
Dovetail Fitting
Tool Holder (7)