Redefining Home Solar
Quick Start – Solaria PowerXT-R-AC Module
© 2019 Solaria Corporation All rights reserved. Contents Subject to change.
Step 6: Prepare the AC Modules
Before installing the AC module, the microinverters must be lifted from the shipping position. On the
ground, turn the AC Module so that the microinverter faces you. lift the microinverter up. You will hear
four clicks as the microinverter locks into the installation position.
Step 7: Use the Serial Number Labels to Create the Installation Map.
The Enphase Installation Map is a diagram of the physical location of each
module in your PV installation. Record the module placement for the system
or provide your own layout if you require a larger or more intricate installation
map.
Step 8. Connect the Microinverters as the AC Modules are Installed
A.
Place the modules on the roof. Do not place the modules in such a way that places pressure on the
microinverter. Minimum distance from the top edge of the module to the rail should be about 12 inches.