1 About this manual
3.1 Warranty, guarantee, liability
3.1.1 Technical requirements for warranty and gua-
3.2 Standards, guidelines, regulations
3.5 Supply air in the installation room
3.6 Room sealed operation (RS)
3.7 Heating system fill-up water
3.7.2 Avoiding water-side corrosion
3.8 Information about the hydraulic connection
4.4 Dimensions and connections
4.4.1 Flue gas pipe facing upwards - dimensions
5.1 Prepare and position the boiler
5.1.1 Removing the ash container
5.1.3 Removing the boiler door
5.1.4 Removing the disposable pallet
5.1.7 Removing the right-hand side panel
5.1.8 Setting the adjustable feet
5.1.9 Fitting the ball valve for return 1 and flow 2
5.2 Establishing the room-sealed connection
5.3 Establishing the chimney connection
5.3.1 pellet elegance Flue gas pipes: Overview
5.3.2 Flue gas pipe facing upwards (optional)
5.3.3 Flue gas pipe: Hole for emission measurement
5.4 Connecting the pellet hose
5.4.1 Electrically earthing the pellet hose
6.1 Information about installing the hydraulic
6.2 Position of the servomotor on the mixer
6.3 Basic equipment: Buffer charging
6.4 Extension pack for heating circuit 1
6.5 Extension pack for heating circuit 2
6.6 Extension pack: DHW tank charging (or
6.7 Extension pack: DHW tank charging
6.8 Extension: Only heating circuit(s), without
7.2 Filling the heating system
7.3 Venting the heating system
7.4 Connecting the safety valve's blow-off line 32
7.5 Installing thermal overload protection
7.6 Removing the shut-off valve on the buffer
8.1 Power supply for the heating system
8.2 Connections on the power element
8.2.1 Connecting the heating circuit pump (X9, X10)
8.2.2 Pellet conveyor system (X14)
8.2.3 External boiler request (X28)
8.2.6 Installing the emergency OFF switch
8.5 Connecting the control to the internet
11.2 Electrical components - overview
1 About this manual
Dear heating engineer
To ensure reliable and efficient operation of the hea-
ting system, the following points are extremely import-
ant:
–
Correct installation
–
Training of customers in initial commissioning
–
Complying with the specifications and instructions
in this manual
–
Regular maintenance by the system operator
–
Regular maintenance by qualified personnel
2
Installation manual
pelletelegance
Content