SolarEdge SEHAZB-SWITCH-MTR Quick Installation Manual Download Page 2

3. Drill the holes and mount the device using screws and nuts. Fasten the unit to the wall.
4. Release the three internal screws at the bottom of the device, and remove the cable bracket.
5. Connect

 

the

 

load

 

wires

 

to

 

the

 

terminal

 

blocks

 

(see

 

Figure

 2

).

w

Figure 2: AC Switch connections

6. Place the cable bracket over the cables and fasten using the screws.
7. Attach the cover to the device and fasten the screws.
8. For configuration and troubleshooting, refer to

http://www.solaredge.com/sites/default/files/se-device-control-switch-installation-guide.pdf

.

Specifications

ELECTRICAL SERVICE

SEHAZB-SWITCH-MTR

Units

Operating Voltage Range - Line to Neutral

90 - 250

Vac

AC Frequency

50/60

Hz

Maximum Active Power Measurement

3

kW

Maximum Load Current

13

A

COMMUNICATION

Supported Communication Protocol

ZigBee Home Automation

Nominal Transmit Power

3

dBm

Operating Frequency Range

2.4 - 2.5

GHz

Outdoor (LOS) Range

100

m

50

m

Indoor

 

Range

1

STANDARD

 

COMPLIANCE

Radio

ETSI EN 300 328 V 1.8.1, ETSI EN 301 489-1, ETSI EN 301 489-17

Safety

EN 60335-1, EN 60335-2-30, EN 50371

Immunity

EN 55014-2

Emissions

EN 55014-1, EN 61000-3-2, EN 61000-3-3

INSTALLATION SPECIFICATIONS

Operating Temperature Range

0 to +50

°C

Protection Rating

IP30

Dimensions (H x W x D)

110 x 70 x 25

mm

Mounting Type

Wall mount

1

Approximate values. May differ depending on specific installation conditions.

AC

 

Switch

 

Quick 

Installation

 

Guide

 

MAN-01-00288-1.

1

2

AC Switch with Meter Quick Installation Guide

Reviews: