To allow for heat dissipation, maintain clearance as specified below.
Figure 3: Power optimizer clearance
When installing modules in a confined space, for example, if installing Building-
integrated photovoltaic (BIPV) modules, ventilation measures may be needed to
ensure the power optimizers are not be exposed to temperatures outside their
specifications.
Step 1: Mounting the Power Optimizers
For each of the power optimizers
(1)
:
1. Determine the power optimizer mounting location and use the power
optimizer mounting brackets to attach the power optimizer to the
support structure . It is recommended to mount the power optimizer
in a location protected from direct sunlight. For frame-mounted
power optimizers follow the instructions supplied with the optimizers,
https://www.solaredge.com/sites/default/files/installing_frame_
.
2. If required, mark the mounting hole locations and drill the hole.
CAUTION!
Drilling vibrations may damage the power optimizer and will void the
warranty. Use a torque wrench or an electric drill with adjustable clutch that
meets the mounting torque requirements.
Do not use impact drivers for
mounting the power optimizer.
Do not drill through the power optimizer or through the mounting holes.
(1)
Not applicable to smart modules.
EV Charging Single Phase Inverter Guide MAN-01-00583-1.5
18
Step 1: Mounting the Power Optimizers
Summary of Contents for SE3680H
Page 90: ......