Modbus Address
ID 1
ID 2
ID 3
5
Up
Down
Up
6
Down
Up
Up
7
Up
Up
Up
Termination DIP switches
The Termination DIP switches are used to configure RS485 wiring termination. The
termination options are listed in the table below. See the figure
Switches on page 9 for switch direction guidelines.
RS485 Termination
TERM 1 TERM 2
Terminated (factory default)
N/A
Down
Not Terminated
N/A
Up
Figure 4: ID and Termination DIP Switches
Meter Connection
The SolarEdge inverter or the Commercial Gateway reads the exported/imported power
from a meter installed at the grid connection point or reads the consumption from a
meter installed at the load consumption point.
Chapter 1: Introduction
9
Energy Meter with Modbus Connection MAN-01-00270-1.3