![SolarEdge SE K Series Installation Manual Download Page 13](http://html1.mh-extra.com/html/solaredge/se-k-series/se-k-series_installation-manual_1313719013.webp)
For installing the communication options, you may also need the following:
For Ethernet:
CAT6 twisted pair Ethernet cable with RJ45 connector
If using a CAT6 cable spool: RJ45 plug and RJ45 crimper
For RS485 :
Four- or six-wire shielded twisted pair cable
Watchmaker precision screwdriver set
Installation Procedure
The following procedures, are required for installing and setting up a new SolarEdge
site. Some of these procedures also apply to modification of an existing site.
1.
Installing the Power Optimizers
2.
Installing the Synergy Manager and Synergy Units
3.
"Connecting AC and PV arrays to the Synergy Manager" on page 35
4.
Connecting AC and PV Strings to the Synergy Manager
5.
Activating, Commissioning and Configuring the System
6.
Setting Up Communication with the Monitoring Platform
Three Phase Inverters with Synergy Technology
12
Installation Procedure
Summary of Contents for SE K Series
Page 74: ......