2
UPS for 400 Vac Grid, Installation Guide, doc. rel. 3.0
- OR -
Figure 2: ShockWatch and TiltWatch devices
These devices indicate if the package was subject to shock or tip-over.
4.
Using a forklift, move the shipping crate close to the place in which the UPS will be
installed.
5.
Cut and remove any straps that are on the shipping crate.
6.
Stand on a secure ladder and use an electric screwdriver to remove the screws that are
holding the roof of the shipping crate in place. Then remove the roof.