UPS for 400 Vac Grid, User Guide, doc. rev. 4
70
8.2.4.1.
Setup > STSW > Calibrate bypass voltage
Caution!
For calibration, refer to SolarEdge Customer Service. Field calibrations are not
allowed.
8.2.4.2.
Setup > STSW > Calibrate output voltage
Caution!
For calibration, refer to SolarEdge Customer Service. Field calibrations are not
allowed.
8.2.4.3.
Setup > STSW > High-level setup
These functions are related to the static switch.
Figure 56: Setup > STSW > High-level setup
Static Switch parameters should not be changed unless necessary.