December 2020
|
Solar Stik
®
, Inc.
80
|
SYSTEM SETUP AND OPERATION GUIDE FOR THE SOLAR STIK USAF G-BOSS MEDIUM AND HEAVY HYBRID POWER SYSTEM
PRELIMINARY DRAFT
MAINTENANCE INSTRUCTIONS
HPS Preventive Care and Maintenance
Follow these procedures to maintain the System. See PMCS tables for details.
• Shade the components (except the PV arrays) from direct sun exposure and shelter them
from the elements
• Clean air filters of the PRO-Verter and Power Hub (if using) air intake vents once a month or more
frequently as warranted to minimize the accumulation of internal heat.
• Follow the generator maintenance procedures listed in the generator operator and maintenance
manual.
• Keep component case lids and unused Inter-Connect port covers closed to prevent water/dust
intrusion.
• Ensure the panels of the PV arrays are clean and positioned for maximum daily sunlight
exposure.
• Ensure the Solar Cables are secured.
• Check the integrity of electrical connectors and communication contacts on a monthly basis.
• Turn off electrical appliances when they are not in use to save power and allow more power to be
available when needed.