24VDC PRO-Verter 7000-120 AGS Operator Manual
OPERATOR INSTRUCTIONS
Power Up the PRO-Verter
The PRO-Verter must be connected to a 24 VDC power source (such as 24VDC Expander Paks) to
operate. When the PRO-Verter is connected to an active DC circuit and is powered on, the master
control board that commands the various internal circuits performs an internal diagnostic check to
ensure the functions can be safely used. While this is occurring, the LCD at the keypad will flash
individual revision information for all of the control boards that are installed.
24 VDC Power
Source
Toggle Power
Switch to ON
Figure 16. Powering up the PRO-Verter
Figure 17. Setting the PRO-Verter clock
The LCD screen will automatically display the “Set Clock” screen after it has been turned on. The
series of pictures in Figure 17 shows what the operator will see at each stage of the process. Follow
the steps in order.
Set the Clock