background image

·   

   

Install the solidifying bars (H, H1, I & I1) according to the angle 
and also solidifying bars (H2 & I2) in the middle zone using 
previously inserted screws (Y). Tighten using bolts (Y).

Y

-

17

-

Step

-

13

Mb

1

N

Ma

1

I

H

F

E

D

You

 

must

 

install

 

the

 

roof

 

panels

before

 

the

 

solidifying

 

bars

.

Summary of Contents for 772830153248

Page 1: ...Owner s Manual Sedona 3 6x4 25 12x14ft Hardtop Gazebo Sojag Code E500 3153248 UPC Code 772830153248 Date of purchase ___ ___ ___ ...

Page 2: ...en created for all four seasons and will resist to snow accumulations of 907 kg 2000 lb However you must remove any snow accumulation on the roof at all time The optional mosquito netting must be removed for winter storage 9 Do not place any type of heat conductor under the sun shelter or within 1 5 m 5 ft of the unit including but not limited to a barbeque or space heater Warranty WHAT IS COVERED...

Page 3: ...imitations or local homeowner s restrictions and obtain any required permit before purchase and installation of the products Make sure that all the parts are in the box before starting the assembly Some parts may contain sharp edges wear protective gloves This unit will take at least 5 hours to set up You must schedule enough time to complete the assembly You cannot leave the sun shelter unattende...

Page 4: ...on 4 2 2 2 2 2 Column C1 Corner roof bar Middle roof bar F1 Middle roof finishing bar Right roof finishing bar Left roof finishing bar 2 B1 Long ogee Solidifying bar Solidifying bar Solidifying bar D 2 Corner roof bar 1 Solidifying bar Outside roof connector Solidifying bar Inside roof connector Solidifying bar H H1 H2 I I1 I2 J J1 ...

Page 5: ...er finishing ends Finishing ends Right roof panel upside Right roof panel downside Middle roof panel upside Middle roof panel downside Left roof support bar Right roof support bar Middle roof support bar Joint cover plate Bases Corner cover Q 4 Solidifying bar A2 Winter solidifying Column 2 ...

Page 6: ...stration Item Description Qty Hook M6 x 10 with nutcap Screws S Mosquito net 4 V 4 X 64 32 Y M6 x 35 Screws 8 W M6 x 12 D12x20 M6 x 12 Screws M6 x 16 Screws 57 20 M6 x 12 with nutcap Screws 16 10 20 Y1 U U1 Allen key Wrench 2 2 Optional ...

Page 7: ...Step 1 X4 Install column A on base K using screws U 5 U X12 A K U A K ...

Page 8: ...p 2 X2 Slide 7 hooks T into each short track B B1 and 9 hooks T into each long track C C1 Attach the ogee B to the ogee B1 with screw U Repeat with the ogee C C1 6 U X16 B1 B C C1 7x 9x For add or remove hook 64 ...

Page 9: ...ween two 2 columns A using screws V through welded bracket on ogee screws U from inside the column A and screws W from outside the column A Repeat with the ogee C C1 7 Step 3 You need 3 people for this step U X4 V X16 W X8 W W A A A A ...

Page 10: ...Step 4 X4 8 Install the joint covers L1 using screws X in the center of ogees B B1 and C C1 Install the corner covers L using screws X X X32 ...

Page 11: ...Step 5 9 Q Q Q Q Q Q U U U X8 Install solidifying bars Q inside each structure bar using screws U ...

Page 12: ...Step 6 10 Slide 2 screws Y in each roof bar D D1 E to install the solidifying bar in further step 1 Y O D D1 E 2X Y X20 ...

Page 13: ...p of columns using screws U Install roof bars D one at a time to the inside roof connector J1 using screws U1 Make sure not to use previously inserted screws Place roof structure on top of D D1 U1 1 2 2 2 2 1 1 1 U1 2 U U X4 U1 X8 ...

Page 14: ...Step 8 12 Install roof bars E to the inside roof connector J1 using screws U1 and screw to ogees with screws U Repeat for all six bars E E U1 1 U1 U X6 U1 X12 2 U ...

Page 15: ...Step 9 13 Install the outside roof connector J on the inside roof connector J1 using screws U Don t over tighten before placing the polycarbonate roof panels U X3 ...

Page 16: ...a in roof bar s upper tracks according to the picture Make sure they are completely inserted in the tracks Insert roof panels P from the end of the roof bars E in the middle of the wide side of the shelter Align with the other panels Install the roof support bar N N1 N2 according to picture Make sure they are completely inserted in the tracks Align N2 with N N1 ...

Page 17: ...s i s d p i e u Install the roof panels Mb and M1b all the way in roof bar s bottom tracks Insert roof panels P1 from the end of the roof bars in the middle of the wide side of the shelter Align with panels Mb M1b 15 This ide p s u ...

Page 18: ...f the shelter starting from left to right Install roof finishing bar F a roof finishing bar F2 and a roof finishing end O1 using screw Y1 in the end of the roof bar E Repeat with F1 Use finishing end O for the corners 16 Y1 X10 ...

Page 19: ...H1 I I1 according to the angle and also solidifying bars H2 I2 in the middle zone using previously inserted screws Y Tighten using bolts Y Y 17 Step 13 Mb 1 N Ma 1 I H F E D You must install the roof panels before the solidifying bars ...

Page 20: ...Step 14 Install the optional mosquito netting S along the tracks on the hooks T Make sure the corner of mosquito netting S lines up with columns A 18 S x4 Start 0 e 1 sid 1 s e 2 id 1 ...

Page 21: ... Install winter kit bars A2 under the inside before the winter season in order to solidify the roof due to heavy snow roof connector Step 15 19 A2 X2 A2 A2 ...

Page 22: ...use screws in accordance to the surface your product will be installed upon Install the screws in the pre drilled holes of the bases K of the shelter Screws are not included This step is mandatory for the warranty to apply since this is a permanent structure 20 MADE IN CHINA 1 ...

Reviews: