Chapter 3 - Hardware installation
© Softing Industrial Automation GmbH
9
3
Hardware installation
3.1
Mounting and dismounting
Note
Make sure edgeGate is mounted in a manner that the power supply disconnecting device or
interrupt facility can always be reached easily.
Note
Depending on the installation position, the maximum ambient operating temperature may
differ. Refer to section
Installation and inspection
Installation and inspection tasks are to be carried out by qualified personnel only, i.e.
personnel qualified according to TRBS 1203 or similar! The definition of terms can be found
in IEC 60079-17.