background image

3

连接电流互感器

    Connect CT Sensors Grid (Inputs Grid PHA,PHB,PHC)

        CT 

方向由电网到负载

        

Make sure the CT is installed in the right direction: The arrow on the CT must be form grid to load.

        CT

采样线按照图示方式延长,必须保证

R

相的

CT

接 

IR

S

CT IS

T

CT IT

        

Wiring the signal wires of the CT as below picture, make sure that the CT which place the R phase line, 

        the signal wire of this CT must be connected to IRA / IRB of the ARPC. Don’t be in ISA/ISB or ITA/ITB.

相的

相的

485A 485B RY

  6 RY

  5 RY

  4 RY

  3 RY

  2 RY

  1 COM

ITB

ITA

ISB

ISA

IRB

IRA

T

S

R

N

R

S

T
N

2

连接电压采样信号线

(80-270Vrms)

   Connect Voltage References

   

          

连接

N

线

              

Connect Neutral to Inputs Grid N

   

          连接相线

R

S

             Connect Voltage References to Inputs Grid R,S,T
   

           

提示

1

:不能将火线和零线接反。

             

NOTE1: Don’t reverse the R phase line (or L line) to Grid N.

485A 485B RY

  6 RY

  5 RY

  4 RY

  3 RY

  2 RY

  1 COM

ITB

ITA

ISB

ISA

IRB

IRA

T

S

R

N

R

S

T
N

Shenzhen SOFARSOLAR Co.,Ltd. c

Page 2

CT 

延长线压接方式

 CT sampling extension

 

cable.

 

Grid

Load & inverter

电网

负载

 & 

逆变器

Summary of Contents for 4-12KTL-X

Page 1: ...信号延长线缆 线缆规格 AWG 20 22 CT sampling extension cable cable section AWG 20 22 限载信号线缆 推荐使用网线或AWG 20 22 Loading limit cable we recommend using network cable or AWG 20 22 设备安装 Installation 步骤一 选择合适的墙面 对准防逆流控制器的安装孔位钻两个孔 并将膨胀管敲进孔内 Step1 Choose the position for drilling holes and then mark the holes position by using a marker use the hammer drill to drill hole on the wall Then put the rear panel on the wall...

Page 2: ...connected to IRA IRB of the ARPC Don t be in ISA ISB or ITA ITB 相的 接 相的 接 485A 485B RY6 RY5 RY4 RY3 RY2 RY1 COM ITB ITA ISB ISA IRB IRA T S R N R S T N 2 连接电压采样信号线 80 270Vrms Connect Voltage References 连接N线 Connect Neutral to Inputs Grid N 连接相线R S T Connect Voltage References to Inputs Grid R S T 提示1 不能将火线和零线接反 NOTE1 Don t reverse the R phase line or L line to Grid N 485A 485B RY6 RY5 RY4 RY3 RY2 ...

Page 3: ...e N wire or the earth wire 提示4 CT不能同时穿过L线和N线 NOTE4 Don t place the sensor on the N and L wire simultaneously 提示5 CT延长线不能超过100米 NOTE5 The length of CT s cable cannot over 100m 防逆流控制器 Anti Reverse Power Controller ZERO PULL ARPC Voltage sample 4 连接限载信号线 Connect the loading limit signal wires 连接ARPC COM到逆变器能量管理模块的GND Connect ARPC S COM to the GND pin of the Inverter Power Control Module 连接 ARPC RY1到逆...

Page 4: ...好螺丝 Step2 Insert the terminal and lock the screw 不同型号机器限载信号线顺序不同 The order of the signal wire is different in different models 如图所示 图a为4 12KTL X逆变器限载信号线连接示意图 图b为其他型号逆变器限载信 号线连接示意图 As shown in the figure figure a is the schematic diagram of the connection of the load limit signal wires of 4 12KTL X inverter while figure b is the schematic diagramof the connection of the load limit signal wires of o...

Page 5: ...Green LED On 红灯闪烁 Red LED Flicker 红灯常亮 Red LED On 控制器上电 Power to ARPC 系统降载 Generation Available 电网电压采样与互感器采样相位不对应 The phase of grid voltage sampling is not corresponding to the CT sampling 图b 2 5 显示灯说明 Operation Indicators 图b 1 Fig b 1 Fig b 2 ...

Page 6: ...上使能防逆流功能 Enable Reflux function on inverter 选择 1 参数设置 Select 1 Enter Setting 选择 20 设置防逆流 Select 20 Set RefluxP 按 Enter 键输入密码 0001 Press button Enter to input password 0001 Shenzhen SOFARSOLAR Co Ltd c Page 6 ...

Page 7: ... 选择 使能防逆流功能 Press button Enter to select Reflux Enable 设置成功 Success Shenzhen SOFARSOLAR Co Ltd c Page 7 ...

Reviews: