![Sofar solar AMASS GTX2500 User Manual Download Page 18](http://html.mh-extra.com/html/sofar-solar/amass-gtx2500/amass-gtx2500_user-manual_1311954018.webp)
AMASS GTX2500
User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
15
Discharging Battery Level Indicators Instructions
Note: The flashing instructions, flash 1 - light 0.25s / off 3.75 seconds; flash 2 -
0.5s light / 0.5s off; flash 3 - 0.5s light / 1.5s off.
5.2.3
Link Port and Automatic Coding Function
Link Port In / Link Port Out Communication follow RS485 protocol, for
communication between multiple parallel batteries.
After confirming the wiring is correct(refer to section 6.4.2), long press the startup
button of the
Master PACK
, after normal startup, the parallel battery system will
automatically code and assign ID to each parallel PACK, and then the parallel
system will run normally(refer to section 5.2.1).
L8
L7
L6
L5
L4
L3
L2
L1
0
~
17%
OFF
OFF
OFF
OFF
OFF
Light
18
~
33%
OFF
OFF
OFF
OFF
Light
Light
34
~
50%
OFF
OFF
OFF
Light
Light
Light
51
~
66%
OFF
OFF
Light
Light
Light
Light
67
~
83%
OFF
Light
Light
Light
Light
Light
84
~
100%
Light
Light
Light
Light
Light
Light
Status
Discharge
Battery Level Indicator
Battery Level
(
%
)
Flash 3
OFF
Summary of Contents for AMASS GTX2500
Page 7: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 4 ...
Page 13: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 10 ...
Page 24: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 21 ...
Page 29: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 26 Step 2 Stack the batteries ...
Page 32: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 29 ...
Page 34: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 31 ...
Page 35: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 32 ...
Page 39: ...AMASS GTX2500 User manual Copyright Shenzhen SOFARSOLAR Co Ltd 36 ...