Sodex Sport S27215B Assembly Instructions Download Page 2

 2

 

FIXATION & SEALING

 

-

 Dig the holes for the sealing of the sockets 

according to the dimensions indicated on dra-

wing n°1 and n°2.

 

-

 Fill the sealings with CPJ 45 concrete dosed 

at 350 kg/m³ . Pour the concrete around every 

socket. Let the concrete set for a minimum of 

72h.

 

400 mm 

 

350 

mm

 

 

300 

mm

 

Socket

 

NB: All the dimensions are in millimeter

Careful: the sockets have 

an incline of 0.5°.

 

INSTALLATION OF THE POST IN 

THE SOCKET : 300 mm

 

6060(± 5) mm

 

NET

 

DRAWING N

3

Reviews: