Sodex Sport S14090GC Product Sheet Download Page 5

 5

 

MONTAGE

 

1

 

FIXATION OF THE SIDE BARS (

x4)

 

NECESSARY 

ITEMS

 

 

NECESSARY TOOLS (NOT INCLUDED)

 

INCLUDED ITEMS

 

 

 

 

 

 

 

 

Wrench  17

 

Wrench  19

 

x4

 

S

cr

ew

M

12

x4

0

 

x8

 

W

as

he

rs

 M

12

 

x32

 

V

is

 M

12

x4

0

 

x16

 

V

is

 M

10

x5

0

 

x32

 

E

cr

ou

M

12

 

x48

 

R

on

de

lle

M

12

 

x40

 

R

on

de

lle

M

10

 

x8

 

S

cr

ew

M

10

x4

0

 

x24

 

Lo

ck

nu

ts

 M

10

 

Choose the wanted height (2m60 ou 3m05).

 

 You can choose the height of the panel by changing the orientation of the bars.

 

Screws M12x40 

 

Washers M12

 

ETAPE 2

 

Option 2m60

 

Option 3m05

 

ETAPE 1

 

Summary of Contents for S14090GC

Page 1: ...duct MAINTENANCE The equipement has to be regularly maintained by the owner It is adviced to Check every week that all the screws are correctly tightened Fix paint defects if the module has been damaged using the adapted paint specified by the manufactu rer Replace all damaged or missing parts with a spare part recommended by the manufacturer Clean the product by using dishwasher soap clean water ...

Page 2: ...SSAIRES 900 mm 4 Screws M18x40 4 Washers non in cluded Realize the sealing with concret CPJ45 do sed by 350 kg Wait at least 72 hours to put the posts in the sockets 6 days during winter Assemble the main tube using the recom manded screws ...

Page 3: ...r kit according to the dimensions written Put the attachment plate in the hole Maintain it vertically and in the right posi tion by using bars Fill the sealings with CPJ 45 concrete dosed at 350 kg m Pour the concrete around the attachment plate Let the con crete set for a minimum of 72h ...

Page 4: ...t of 12mm of diametre Start by drill the two holes on the top For outside using it s necessary to put some silicone around the hole to protect them from water Put the panel on it support check the height and then put a mark for the drill of the last holes NECESSARY TOOLS NOT INCLUDED Drill Silicone DRILLING OF THE PANEL ...

Page 5: ...Screws M12x40 x8 Washers M12 x32 Vis M12x40 x16 Vis M10x50 x32 Ecrous M12 x48 Rondelles M12 x40 Rondelles M10 x8 Screws M10x40 x24 Locknuts M10 Choose the wanted height 2m60 ou 3m05 You can choose the height of the panel by changing the orientation of the bars Screws M12x40 Washers M12 ETAPE 2 Option 2m60 Option 3m05 ETAPE 1 ...

Page 6: ...better understanding half of the screws have been removed ScrewsM12x40 Washers M12 Nuts M12 x4 Screws M12x40 x4 Nuts M12 x8 Washers M12 x4 Spacers D13 x6 Screws M10x50 x12 Washers M10 x2 Screws M10x40 x6 Locknuts M10 Vis M10 50 Rondelles M10 Ecrous M10 Screws M10x40 Washers M10 Locknuts M10 Screws M10x50 Washers M10 Locknuts M10 ...

Page 7: ...7 ASSEMBLY 4 ASSEMBLY OPTION HEIGHT CHOICE NECESSARY ITEMS 2 60 m 3 05 m Change the side bar to modified the height of the panel ...

Page 8: ... layers A11 S14333O S14850 I Baskets nets 2 2 Plastic bubbles cardboa rd 5 layers A12 S14090GC 03 A Mounting plate 4 Plastic bubbles cardboa rd 5 layers A13 S14090GC 09 A Accessories 1 cardboard 5 layers OPTION AGAINST LOCK Package N Designation Description Qty Note A14 Anchor kit 1 Stick on the main tube PRE ASSEMBLED ACCESSORIES Package N Designation Description Qty Note A2 Sticker Stick on the ...

Reviews: