Automatic COSYS PFC system

 - Ref. : 539931A

Checking the equipment

Before commissioning the equipment, ensure that all 

connections are correctly tightened, as the terminals 

may become loose during transportation of the equip-

ment from the production plant to the site (interrupter, 

switch etc.).

Operation of an automatic PFC system requires the 

total current consumed by the installation to be measu-

red.

Powering up

Once the operations in the previous paragraph have 

been carried out, the equipment can be started by 

closing the upstream panel protection and the PFC 

system cabinet switch (depending on the model).

Caution When opening the secondary of a current 

transformer, dangerous voltage may appear. When 

handling the regulator, it is recommended the current 

transformer's secondary is short circuited by fitting a 

PTI.

Control relay configuration

The regulator is factory-configured according to the 

PFC system type and power.

When powered on for the first time, the regulator will 

automatically recognise the connection (order of the 

phases), the switching sequence and the reference 

current.

Only one parameter needs to be set by the user: value 

for the current transformer's primary side, see the regu-

lator manual.

Operating faults

The most common reasons for operational failure 

usually relate to the current transformer (see list below):

•  Current transformer installed on the load.

•  Current transformer installed on the PFC system 

supply cable

•  Current transformer defective or unsuitable.

• Correct connection

S1

S2

T.C.

• Connection errors

S1

S2

T.C.

S1

S2

T.C.

COSYS 146 A

COSYS 147 A

Current transformers

COMMISSIONING AND MAINTENANCE

Summary of Contents for COSYS PFC Series

Page 1: ...я установка компенсации реактивной мощности Socomec Cosys руководство по эксплуатации Юниджет Постоянная ссылка на страницу https www uni jet com catalog kompensatoryi reaktivnoj moshhnosti avtomaticheskaya ustanovka socomec cosys pfc html ...

Page 2: ...Automatic COSYS PFC system Operating instructions EN ...

Page 3: ...INSTALLATION____________________________________7 Recommendations relating to installation conditions___________________________7 Connecting the input cables_______________________7 Upstream protection and connection cross section____7 Technical characteristics__________________________8 COMMISSIONING AND MAINTENANCE____________12 Checking the equipment_________________________12 Current transform...

Page 4: ...or incorrect use of products PFC system not adapted to the network The warranty s validity period is 12 months following installation of the equipment and may not exceed 18 months from the supply date Parts replacements repairs or modifications carried out by the manufacturer during the warranty period may under no circumstances be grounds for extending the length of the warranty period In order t...

Page 5: ...ilure to follow this instruction shall release Socomec from all liability with regard to the incorrect operation of the equipment and the consequences thereof i The maintenance operations must only be carried out by authorised personnel with the appropriate training j This system satisfies the European Community directives applicable to this product This is indicated by the following marking k Com...

Page 6: ... may come from a factory or a production unit Power from 17 5 to 900 kVar Harmonics from 0 to 100 in 4 stages PFC41 PFC42 PFC43 PFC44 Cable input at the bottom can be the top if required Base plate optional Thermal regulation with fan depending on equipment 6 or 12 output power factor correction regulator depending on the model with alarm relay Self healing capacitors Capacitor cut off from the au...

Page 7: ...TI 0V 230V 140 140 We would advise fitting a PTI current transformer automatic short circuiter to the current transformer secondary to prevent any electrical risks when the current transformer is disconnected current transformer and PTI not supplied Wiring diagram with regulator COSYS R 12H ...

Page 8: ...ower control and measurement cables should be connected in accordance with the standards in force and good practice The cable bushing plate should be refitted after the cable gland or other cable passage system has been fitted Failure to follow this instruction may seriously compromise the ventilation efficiency reduce the cabinet s level of protection and cause the formation of hazardous material...

Page 9: ...YS R 12H 850 1227 1800 Consult us 5 2000x 2x600 x600 650 COSYS R 12H 900 1299 2000 Consult us 5 2000x 2x600 x600 720 COSYS R 12H Power supply I nominal Upstream protection Figure n Height x Width x Depth Weight Regulator Kvar A GG fuse A Fuserbloc A without switch with switch mm mm with switch Kg 17 5 25 40 50 3 3 1211x600x311 1211x600x311 38 COSYS R 6H 30 43 80 100 3 3 1211x600x311 1211x600x311 5...

Page 10: ... 1500 COSYS R 12H 900 1299 2000 Consult us 5 2000x 2x800 x600 1620 COSYS R 12H Power supply I nominal Upstream protection Figure n Height x Width x Depth Weight Regulator Kvar A GG fuse A Fuserbloc A without switch with switch mm mm with switch Kg 17 5 25 40 Consult us 3 3 1211x600x311 1211x600x311 38 COSYS R 6H 30 43 80 Consult us 3 3 1211x600x311 1211x600x311 55 COSYS R 6H 50 72 125 Consult us 3...

Page 11: ...Ref 539931A Figure 1 500 500 80 130 307 460 Ø7 Ø30 460 Figure 2 600 800 70 175 282 560 Ø30 760 Figure 3 600 1200 100 100 100 307 560 Ø30 1160 Figure 4 600 800 2000 400 500 Ø7 Ø7 100 100 Socle option 100 100 Socle option INSTALLATION ...

Page 12: ...utomatic COSYS PFC system 100 100 100 Ø30 Figure 4 600 800 2000 62 5 62 5 50 75 400 500 Ø11 Figure 5 600 800 2000 420 620 65 65 60 60 600 400 600 40 320 520 100 150 Ø14 100 100 Socle option 100 100 Socle option 100 100 Socle option INSTALLATION ...

Page 13: ... the regulator it is recommended the current transformer s secondary is short circuited by fitting a PTI Control relay configuration The regulator is factory configured according to the PFC system type and power When powered on for the first time the regulator will automatically recognise the connection order of the phases the switching sequence and the reference current Only one parameter needs t...

Page 14: ...ator Auxiliary circuit fuses Capacitor fuses Cleanliness of the ventilation grille and the filter to ensure proper ventilation of the enclosure Operation of the switches and retightening of their terminals Visual inspection of the capacitors by replacing those that are causing deforming of the upper part of the outer enclosure COMMISSIONING AND MAINTENANCE SOCOMEC can also offer maintenance audit ...

Page 15: ...14 Automatic COSYS PFC system Ref 539931A ...

Page 16: ...Automatic COSYS PFC system Ref 539931A 15 Automatic COSYS PFC system ...

Page 17: ... S L E 08310 Argentona Barcelona Tel 34 93 741 60 67 Fax 34 93 757 49 52 info scp es socomec com ThE NEThERLANDS SOCOMEC B V NL 3991 CD Houten Tel 31 0 30 760 0901 Fax 31 0 30 637 2166 info scp nl socomec com ThE UNITED KINGDOM SOCOMEC Ltd Hitchin Hertfordshire SG4 0TY Tel 44 0 1462 440033 Fax 44 0 1462 431143 info scp uk socomec com I n A S I A NORTh EAST ASIA SOCOMEC CHINA Co Ltd P R C 200052 Sh...

Reviews: