background image

Parts List

Ceiling or Wall Bay Installation

Run the speaker wire to the installation location. Be sure the wire meets electrical and building code requirements.

Decide which of the wire inputs you want to use and remove the appropriate knockout cover(s). If the wiring will be 
“daisy chained” to other speaker, remove other knockout covers as needed. Snap a ULM connector into each of the 
knockouts removed. 

If you are using a 70/100 V constant voltage transformer, mount it on the mounting studs provided inside the FRB. 

Position the FRB unit between the rafters or studs. The mounting holes in the front plate align with common rafter/stud 
separation. Center the mounting screw holes over the rafter/stud and level the FRB.

Fasten the FRB to the rafter/stud with at least 4 screws.

Before installing the drywall, carefully measure the location of the FRB unit and cut the appropriate hole. The  hole 
cutout diameter is listed in the specifications table. 

Connect the speaker (and the 70/100V transformer if it is used)  and mount the speaker according to the instructions 
supplied with it. 

FRB68

Drop Ceiling Support Rails

ULM Connectors

not to scale

Support Rail Mounting Hardware

not to scale

FRB68 Manual.indd   4

6/11/07   10:38:05 AM

Reviews: