LC2000/LC2000-IQ/LC4000/LC4000-IQ
Installation
Issue 1 Rev 6
Page 25
© 2015 SAM
3.
Installation
3.1 Unpacking the Unit
The unit is packed in a single cardboard box. Unpack the box carefully and check for any
shortages or shipping damage. Report any shortages or shipping damage to SAM
immediately.
The box contains the following items:
•
KudosPro LC2000/LC2000-IQ/LC4000/LC4000-IQ unit
•
Optional
: Up to two IQ modules and rears fitted in the KudosPro unit
(LC2000-IQ/LC4000-IQ only)
•
Two power cables
•
Operator’s Manual CD
3.2 Rack Mounting the Unit
Ensure that sufficient space is available for the unit.
When installing the unit, place on a suitably specified and installed rack shelf and secure the
unit using the front rack ears.
3.3 Ventilation
Ensure that there is a free flow of air at the front, rear, and sides of the unit to dissipate the
heat produced during operation. Installations should be designed to allow for this.
3.4 LC2000-IQ/LC4000-IQ Only
3.4.1 Removing IQ modules/Rears
For details on removing IQ modules and a full list of compatible IQ modules and rears see the
Recommended Modules for KudosPro-IQ Units Application Note under the
“Support” tab at:
http://www.snellgroup.com/products/conversion-and-restoration/conversion/kudospro/
Refer to “Safety Information” on page 3 before installing and connecting power to the unit.
Note:
Retain any product packaging as it may be required if returning the unit to SAM.
Do not obstruct the ventilation holes on the right-side of the unit. Damage to the equipment
may result.