4
FIGURE 2
IV. INSTALLATION
NOTE: This product has been designed specifically
for commercial and residential applications
such as offices, conference rooms, cafeteria
and living areas. United Air Specialists
assumes no responsibility for those applica-
tions unlike the aforementioned.
The SMOKEETER/CRYSTAL-AIRE is designed to
draw the contaminated air through the unit and
exhaust clean air back into the room. The clean
air is used to push contaminated air around the
room to the inlet of the unit. Directions of air
patterns and proper placement of the unit should
be established by your local SMOKEETER/
CRYSTAL-AIRE distributor or by United Air
Specialists, Inc.
The SMOKEETER/CRYSTAL-AIRE can be installed
by:
1. Placing on desk, file cabinet or other stable surface.
2. Mounting on a wall.
CAUTION: Power connection — The power cord
on this product should be used in con-
nection with a properly-sized and
appropriately located 115 VAC ground-
ed outlet receptacle. No alteration of
the power cord should be attempted
nor should extension cords be used.
To reduce the risk of electric shock,
this equipment has a grounding-type
plug that has a third (grounding) pin.
This plug will only fit into a grounding-
type power outlet. If the plug does not
fit into the outlet, contact qualified
personnel to install the proper outlet.
Do not alter the plug in any way.
WALL MOUNTING OPTION
A wall mounting bracket is provided for mounting
the unit on walls.
Securely attach the wall mounting bracket against
the wall, allowing 2
1
⁄
2
" from the ceiling for clearance
of the unit (see Figure 2).
WARNING: Use fasteners and anchoring devices that
will ensure support of the 27 pound unit.
After the mounting bracket is attached, remove the
unicell assembly from the cabinet to facilitate
handling and lighten the weight (see Removing
Components — page 5).
Slide the keyhole slots in the unit base over the
studs on the wall bracket and allow the base to drop
into place, resting on the studs. Using the screw
provided with the unit, secure the base to the moun-
ting bracket.
The SMOKEETER/CRYSTAL-AIRE should now be
tested for secure support.
Reinstall the components and attach the cabinet.
Plug the unit into a grounded 115 volt AC outlet.
REVERSING AIRFLOW
The unit is shipped to you ready for installation
in a left-to-right airflow configuration. If a right-
to-left airflow is desirable, simply turn unit 180°
(unit will be upside down). Remove plastic logo and
place upright in same position (logo is now located in
upper left).
V.
OPERATION
For best results and to assure maximum air quality,
your SMOKEETER/CRYSTAL-AIRE should be
started before the air becomes contaminated. An
indicator lamp on the unit is illuminated during
normal operation of both the power pack and the
unicell and will dim when the unicell requires
servicing. A solid-state speed control switch allows
you to adjust the fan speed. If you notice a decrease
in cleaning efficiency, increase the fan speed to
increase the unit’s effectiveness.
FOR YOUR INFORMATION — Each SMOKEETER/
CRYSTAL-AIRE has been thoroughly tested prior to
shipment from the factory. Even so, there may
be some initial arcing of the components at start
up. The noise should cease after a few minutes
of operation.