The Pocket Wall Unit (PWU) has been designed for a recessed wall application. The unit should be installed 
directly to the studwork by the chassis edge and /or adjustable side mounting brackets set to suit the associated 
sheetrock thickness and distance between the studs or  the unit can be mounted centrally between the studs or 
directly to one stud and side mounted bracket used to fix to the opposite stud.  The area in front of this unit must 
not be obscured or restricted. Vertical surfaces in front of this unit will impede the air flow and reduce it’s capacity.

 

 

INSTALLATION  PROCEEDURES 

 

Preparation. 

Carefully unpack the unit and the top adjustable mounting brackets (x2) from the carton. The front cover grille has 
been packed separately and should be stored safely until required. 

 

Fitting centrally between studwork 

Mark a distance up from the floor to the desired mounting height. Select the desired thickness of sheet rock to be 
used and loosen the screws of the lower adustable mounting bracket and loosely fit  the top adjustable mounting 
brackets. Measure between the studwork and adjust the brackets to this dimension (D), set the distance between 
the top of the studwork and the outer flange of the chassis to that of the sheetrock (E), Place the unit chassis with 
the top facing up, level with the mark centrally between the studs when in the correct postion screw the adjustable 
brackets to the studwork with suitable wood screws (field supplied) through the six screw holes in the mounting 
brackets (two in each flange). 

 

Fitting to left stud. 

Mark a distance up from the floor to the desired mounting height. Select the desired thickness of sheet rock to be 
used and loosen the screws of the lower adustable mounting bracket and loosely fit a top adjustable mounting 
bracket to the top right hand side of the chassis. Measure between the studwork and adjust the brackets to this 
dimension (D), set the distance between the top of the studwork and the outer flange of the chassis to that of the 
sheetrock (E). Place the unit chassis with the top facing up, level with the mark between the studs when in the 
correct postion screw the adjustable brackets to the studwork with suitable wood screws (field supplied) through 
the four screw holes in the mounting brackets (two in each flange) and the two screw holes in the chassis 
mounting flange. 

 

Fitting to right stud. 

Mark a distance up from the floor to the desired mounting height. Select the desired thickness of sheet rock to be 
used. Remove the lower adustable mounting bracket and loosely fit a top adjustable mounting bracket to the left 
hand side of the chassis. Measure between the studwork and adjust the bracket to this dimension (D), set the 
distance between the top of the studwork and the outer flange of the chassis to that of the sheetrock (E). Place 
the unit chassis with the top facing up, level with the mark between the studs when in the correct postion screw 
the adjustable bracket to the studwork  with suitable wood screws (field supplied)  through the two holes in the 
mounting bracket and the two holes in the chassis mounting flange.  

 

The appropriate size sheet rock can now be fitted around the unit, care must be taken to ensure there is a 
½” gap between the top of the unit and the sheetrock. The grille cover will be installed on the chassis 
(using the four screws provided) after piping, wiring and air bleeding has been completed. 

 

 

Table 1 

 

A B 

14

” 16½” 

 

Note: When fixing unit to studwork ensure there is a ½” gap between the chassis and the top of the 
cut-out

(illustration shows unit mounted centrally between studs, alternatively unit can be fied 

directly to studwork on one side and adjustable brackets used to fix other side). 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Table 2 

 

 

 
 

 
 
 
                                         
 
 
 
 

Piping Location 

Solder the heating system Supply tube to the “back” chassis tube first. Then solder the return line to the “front” 
chassis tube. After soldering the Return connection (front tube), check that both connections are leak free. 

 

Note: isolation valves are recommended on both supply and return piping to allow for service and 
balancing if necessary. 
 

'C'

'B'

'D'

'A'

'E'

 

A B  C 

14½“ 12 

” 3

½

” 