background image

Form# 179914 

08/2018

 

  

 

¼-20 SHOULDER BOLT 

QTY. 4 

¾” THICK SHELF 

QTY. 1 

RAILS 

QTY. 2 

¼-20 PAN HEAD SCREW 

QTY. 4 

#10 X 

¾” WOOD SCREW 

QTY. 8 

SHELF MOUNTING BRACKET 

QTY. 8 

Hardware and Components 

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
Special Notes: 

 

 

TOOLS REQUIRED

:   

 

Safety glasses (to protect from sawdust) 

 

Drill w/#2 Phillips Head Driver Bit.   

 

#2 Phillips Head Screwdriver. 

 

3/16” Allen Wrench. 

 

Ratchet with 7/16” Socket  – or –  7/16” wrench 

 

You will need another person to help assemble the product.   

 

Team lifting required. 

 

Extra person helpful when fitting rails onto table legs. 

 

Check that all components are accounted for and undamaged before assembling. 

 

Please assemble the product in a clean and dry area. 

 

Clean the product with a mild cleaner and a damp cloth. 

Reviews: