Installation
69
EN
The nozzles not provided are available at Authorised Service Centres.
7
LPG G30/31 - 30/37 mbar
AUX
SR
R
UR
Rated heating capacity (kW)
1.10
1.70
3.10
4.10
Nozzle diameter (1/100 mm)
48
62
85
95
Reduced flow rate (W)
400
500
900
1500
Primary air (mm)
3
2
4
open
Rated flow rate G30 (g/h)
80
124
225
298
Rated flow rate G31 (g/h)
79
121
221
293
8
LPG G30/31 - 37 mbar
AUX
SR
R
UR
Rated heating capacity (kW)
1.10
1.80
3.10
4.10
Nozzle diameter (1/100 mm)
48
60
80
92
Reduced flow rate (W)
450
500
900
1600
Primary air (mm)
3
2
2.5
5
Rated flow rate G30 (g/h)
80
131
225
298
Rated flow rate G31 (g/h)
79
129
221
293
9
LPG G30/31 - 50 mbar
AUX
SR
R
UR
Rated heating capacity (kW)
1.10
1.70
3.10
4.10
Nozzle diameter (1/100 mm)
42
54
73
92
Reduced flow rate (W)
400
500
900
1600
Primary air (mm)
3
2
3
5
Rated flow rate G30 (g/h)
80
124
225
298
Rated flow rate G31 (g/h)
79
121
221
293
10
Town gas G110 – 8 mbar
AUX
SR
R
UR
Rated heating capacity (kW)
1.10
1.80
3.0
4.1
Nozzle diameter (1/100 mm)
135
175
230
310
Reduced flow rate (W)
400
500
800
1500
Primary air (mm)
2
1
1
2.5
11
Town gas G120 – 8 mbar
AUX
SR
R
UR
Rated heating capacity (kW)
1.10
1.80
3.10
4.10
Nozzle diameter (1/100 mm)
128
160
220
280
Reduced flow rate (W)
400
500
800
1500
Primary air (mm)
3
1
1
3