-16-
No.PF
※※
-OMN0010-J
Mounting and Installation
Installation
Use the product within the specified operating pressure and temperature range.
Proof pressure could vary according to the fluid temperature. Check the characteristics data for operating
pressure and proof pressure.
Mounting
Never mount the product in a location where it will be used as a support.
Mount the product so that the fluid flows in the direction indicated by the arrow on the side of the body.
Check the flow characteristics data for pressure loss and the straight inlet pipe length effect on accuracy
(page
36
), to determine inlet piping requirements.
Do not sharply reduce the piping size.
Summary of Contents for PF3W5 Series
Page 12: ...11 No PF OMN0010 J Model Indication and How to Order Metal piping...
Page 13: ...12 No PF OMN0010 J Polyvinyl chloride piping...
Page 35: ...34 No PF OMN0010 J PF3W511 Vinyl chloride piping PF3W521 Vinyl chloride piping...
Page 38: ...37 No PF OMN0010 J PF3W521 Metal attachment...
Page 48: ...47 No PF OMN0010 J Dimensions of lead wire with M8 connector ZS 40 A...