(5) IO-Link master configuration
It is necessary to set the JXC controller to the IO-Link master.
First, supply power to the IO-Link master and the power supply L+/L- for communication with IO-Link.
Then, install the IODD (I/O Device Description) file for JXCL1 in the IO-Link master configuration tool
for setting the JXC controller to the master.
The IODD file can be downloaded from the SMC website.
(6) Establishment of IO-Link communication
When the setting of the IO-Link master and JXCL1 controller is completed and the IO-Link
communication is established, the LED
’s on the front of the controller will be set as shown in the table
below.
IO-Link communication starts when the power supply L+/L- for IO-Link communication and the C24V
control power are supplied to the JXC controller.
Items
LED condition
Status
PWR
Green LED is ON
Supply power
ALM
OFF
No alarm
COM
Green LED flashing
IO-LINK communication established
Refer to
7 LED display (P.
for the explanation of the LED
’s.
Communication between IO-Link master and controller is not established when the COM red LED is
on.
Caution
Communication between the IO-Link master and the JXC controller is not established.
Refer to
21. Troubleshooting (P.
).
Check if the communication speed of the IO-Link master and the JXC controller and the information of
the host computer are correctly set.
(7) Setup of the operation parameters
Set up the step data (the operation pattern to specify the target position, speed, etc.) by using the
controller setting software, the teaching box, or IO-Link communication.
When the step data (SMC parameters) is to be changed via IO-Link communication, be sure to
upload all parameters from the JXCL1 controller before making the change.
When the step data is changed using the controller setting software or teaching box, turn off the
IO-Link communication power supply L+/L- connected to the JXC controller and turn it on again to
reflect the SMC parameters.
■PC (Normal mode)
■Teaching box
Please refer to the operation manual for the controller setting software and the teaching box for
setting.
Refer to 10.2.2
10.2.2(2 SMC parameters (P.
37
) for the setting method using IO-Link.
(9) Test run
Refer to
10. Memory map (P.
for the assignment of the memory.
Input signals by IO-Link communication for checking the operation. Refer to
15. Operation
Instructions (P.
for the operation.