G
ROUNDING
THE
C
HASSIS
3-9
Notes: 1.
SFP transceivers are hot-swappable. The switch does not need
to be powered off before installing or removing a transceiver.
However, always first disconnect the network cable before
removing a transceiver.
2.
SFP transceivers are not provided in the switch package.
Grounding the Chassis
Before powering on the switch, ground the switch to earth as described
below.
1. Ensure that the rack on which the switch is to be mounted is properly
grounded and in compliance with ETSI ETS 300 253.
2. Ensure that there is a good electrical connection to the grounding
point on the rack (no paint or isolating surface treatment).
3. Disconnect all power cables to the switch.
4. The switch chassis is connected internaly to 0 V. This circuit is
connected to the single-hole grounding terminal on the back of the
switch. The surface area around this terminal is not painted in order to
provide for a good connection. Attach a 6 AWG stranded copper wire
to the grounding terminal on the switch.
5. Then attach the grounding wire to the ground point on the rack.
Caution:
The earth connection must not be removed unless all supply
connections have been disconnected.
Summary of Contents for 7824M/ESW
Page 2: ......
Page 18: ...TABLE OF CONTENTS xviii E Ordering Information E 1 Glossary Index ...
Page 32: ...ABOUT THE TIGERACCESS SWITCH 1 12 ...
Page 56: ...INSTALLING THE SWITCH 3 18 ...
Page 68: ...TROUBLESHOOTING A 4 ...
Page 76: ...CABLES B 8 ...
Page 82: ...EXTENDER MODULES C 6 ...
Page 92: ...ORDERING INFORMATION E 2 ...
Page 98: ...GLOSSARY Glossary 6 ...
Page 102: ...INDEX Index 4 ...
Page 103: ......