3-2
Installing the Switch
3
Figure 3-1 RJ-45 Connections
Equipment Checklist
After unpacking the switch, check the contents to be sure you have received all the
components. Then, before beginning the installation, be sure you have all other
necessary installation equipment.
Package Contents
• SMC6128PL2 or SMC6152PL2 Fast Ethernet Switch with PoE
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for attaching the
brackets to the switch
• Power Cord
• RS-232 console cable
• This Installation Guide
• Management Guide CD
Optional Rack-Mounting Equipment
If you plan to rack-mount the switch, be sure to have the following equipment
available:
• Four mounting screws for each device you plan to install in a rack—these are not
included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
R
J-45
C
onnector
Summary of Contents for 6152PL2 - annexe 1
Page 2: ......
Page 6: ...vi ...
Page 32: ...2 8 Network Planning 2 ...
Page 40: ...3 8 Installing the Switch 3 ...
Page 56: ...C 4 Specifications C ...
Page 63: ......