
HRX-OM-R016
Chapter 8 Control, Inspection and Cleaning
HRS Series
8.2
Inspection and Cleaning
8-5
Replacement of circulating fluid
Clean the tank and replace the circulating fluid.
For the circulating fluid, select from the specification range shown
in
’’Table 8-1 Quality standard for fresh water (tap water)’’.
When using 15% ethylene glycol solution, check that the concentration is within the
range of 15% +5/-0.
Replacement of circulating fluid (For water cooled type)
Clean the facility water source and replace the facility water.
For the facility water, select from the specification range shown in
standard for fresh water (tap water)
”.
8.2.4
Inspection every 6 months
Check for water leakage from pump (For option T [High head pump])
Remove the panel and check the pump for excessive leakage. If the
leakage is found, replace the mechanical seal. Order the mechanical seal
described in “8.3 Consumables” as a service part.
Leakage from the mechanical seal
It is impossible to prevent the leakage from the mechanical seal completely
because of its structure. Although the leakage is described as 3cc/hr or less.
The recommend life time of the mechanical seal before needing replacement is
6000 to 8000 hours (usually 1 year)
Check point to see leakage
Fig. 8-3 Check for water leakage from pump