4
3.
START-UP :
Open the main gas valve.
Switch the power on.
Start the heater ignition cycle by positionning the speed switch on"MAXI"
and the ignition switch on "I / ON".
If the flame is not lit after 30 seconds, the heater goes to safety state.
The sequence of ignition can begin again only after switching the power off.
After 5 seconds, switch the power on.
The heater is on as long as : power supply is on and the valves
are opened.
If the flame is still not lit or goes out, close the main gas valve, switch
the power off and call your SBM installer.
After 5 minutes heating on the maxi speed, it is possible to put the speed
switch on "MINI".
Always light the heaters on the "MAXI" speed.
Do not put the speed "MINI" before 5 minutes heating on
the "MAXI" speed.
4. SHUT OFF :
Put the ignition switch on "O / OFF".
Close the main gas valve.
5. MAINTENANCE :
To be performed
once a year
by your SBM installer, according to the
SBM INSTALLER INSTRUCTIONS Nr. 05000372.
6. CHANGING THE GAS USED :
For any change in the type of gas used, please contact your SBM
installer.
Summary of Contents for XDI 8 D
Page 5: ......