background image

 

 

 

 

 

BEFORE YOU START: 

 

 

Read all instructions carefully 

 

Identify all parts and check quantities against parts list 

 

Select a level site 

 

Do not mark cladding with pencil as lead can cause corrosion to cladding 

 

 

SAFETY: 

 

 

Do not attempt to build your shed in high winds 

 

Beware of sharp edges, recommend use of gloves 

 

Protect your eyes and ears 

 

For ease of assembly, use a friend to help 

 

 

 

TOOLS REQUIRED: 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WARRANTY REQUIREMENTS

 

 

Following are the minimum requirements for cladding used in Smart Store Sheds. 

 

 

Wash all surfaces annually using a hose and soft nylon brush. 

 

Within 2 km of coast – wash every 3 months as above. After a storm, wash the cladding and the gutters as soon 

as possible to remove any highly corrosive salt deposits. 

 

Volcanic Ash Fallout – wash as soon as possible, removing fall out from roof and gutters. 

 

Do not allow manures, chemicals or other corrosive materials to have direct contact with cladding

.

 

DRILL 

RIVETER 

PHILLIPS DRILL BIT  3.5 & 10 DRILL BIT 

HAMMER 

LADDER 

TAPE MEASURE 

PEN 

NAIL PUNCH 

CONGRATULATIONS ON PURCHASING A SMART STORE SHED.  

BEFORE YOU BEGIN THE ASSEMBLY PLEASE NOTE SOME IMPORTANT POINTS: 

Summary of Contents for SS3030

Page 1: ...ASSEMBLY INSTRUCTIONS SS3030 BASE SIZE 3 020m x 3 020m...

Page 2: ......

Page 3: ...cladding used in Smart Store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash the cladding and the gutters as so...

Page 4: ...m 2 Roof 1 600 m 12 Weatherstrip 1 810 m 1 Door 3 4 Sheet 1 810 m 3 Barge 1 600 m 4 TIMBER Ridge Flashing 1 800 m 2 Bottom Plates H4 Green Front Back 3 020 m 2 Padbolt Support Front 0 140 m 1 Bottom...

Page 5: ...de Back Wall Sheets Front Wall Sheets Door Jambs Front Wall Sheet Door Side Flashing Hinge Door Top Bottom Channel Ridge Beam Jack Stud Ridge Flashings x 2 5 ASSEMBLE FRONT PANEL 6 ASSEMBLE WALLS 7 AS...

Page 6: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 7: ...r as shown Drill and rivet as per dia gram ensuring rivets penetrate into door sheet STEP 4 Rivet door brace flashings onto back of door as shown Where possible rivet from front of door Ensure the doo...

Page 8: ...3 Nail wall sheets to the Top Plate at each end making sure that the top corners of the sheets are flush with the top of the Top Plate and that the sides of the wall sheet overhang the Top Plate by a...

Page 9: ...ate using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the...

Page 10: ...ing Ensure the doors close properly then fit remaining rivets STEP 3 Place 3 x Wall Sheets on timber plates and rivet the sheets together as shown Ensure that the top of the sheet is flush with the to...

Page 11: ...g someone to support the panels while they are screwed together Before fixing ensure that the Side Panel overlaps the Back Panel Using 4 x 40mm screws 2 per join screw the Top and Bottom Plates togeth...

Page 12: ...heck that the shed is sitting level and square and that the diagonal Top Plate measurements are the same fig 1 JACK STUD TOP PLATE RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET...

Page 13: ...PLATE STEP 3 Position 1 x roof sheet slotted end facing back so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet over hangs the end of the Ridge Beam and the Top...

Page 14: ...NTRY FLOOR Position the Floor Joists centrally between the side Base Plates and skew nail each end with two 75mm nails Check that the shed is sitting level and square and that the diagonal Bottom Plat...

Page 15: ......

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...

Reviews: