background image

 

 

PARTS LOCATION

 

5

 

5

 

ASSEMBLE FRONT 

PANEL

 

6

 

ASSEMBLE WALLS

 

7

 

ASSEMBLE ROOF

 

8

 

SECURE SHED

 

4

 

ASSEMBLE BACK 

PANEL

 

3

 

ASSEMBLE SIDE 

PANELS

 

1

 

LAY FOUNDATION

 

2

 

ASSEMBLE DOOR

 

QUICK OVERVIEW

 

Door Sheets

 

Padbolt Support 

 

Top Plate Back

 

Side Wall Sheets

 

Roof Sheets 

 

Top Plate Side

 

Top Plate Front

 

Bottom Plate Front

 

Bottom Plate Side

 

Back Wall Sheets

 

Front Wall Sheets

 

Door Jambs

 

Front Wall Sheet

 

Door Side Flashing

 

Hinge

 

Door Brace

 

Door Top/Bottom Flashing

 

Ridge Beam

 

Jack Stud

 

Ridge Flashings—x 2

 

Barge Flashing

 

Spouting

 

Summary of Contents for SM3025

Page 1: ...ASSEMBLY INSTRUCTIONS SM3025 BASE SIZE 3 020m x 2 520m...

Page 2: ......

Page 3: ...are the minimum requirements for cladding used in Smart store Sheds Wash all surfaces annually using a hose and soft nylon brush Within 2 km of coast wash every 3 months as above After a storm wash th...

Page 4: ...e 1 980m 4 Side Wall Angle 2 040m 2 Roof 1 350m 12 Door 3 4 Sheet 1 850m 3 Door Sides 1 850m 4 Door Jamb 1 890m 2 Door Brace 1 160m 2 Door Brace 0 915m 2 Double Door Weatherstrip 1 850m 1 Barge 1 352m...

Page 5: ...TION QTY DIAGRAM Front Back Bottom Plates H4 Green 3 020 m 2 Front Back Top Plate H1 Red 3 020 m 2 Side Wall Bottom Plates H4 Green 2 520 m 2 Side Wall Top Plates H1 Red 2 520 m 2 Ridge Beam 90 x 45 3...

Page 6: ...EMBLE DOOR QUICK OVERVIEW Door Sheets Padbolt Support Top Plate Back Side Wall Sheets Roof Sheets Top Plate Side Top Plate Front Bottom Plate Front Bottom Plate Side Back Wall Sheets Front Wall Sheets...

Page 7: ...coming through from underneath During construction you may raise the bottom timber plate to allow the wall cladding to protrude 20mm below the bottom plate This will stop water flowing between the bot...

Page 8: ...e on the outside Rivet sheets together ensuring ends are flush with each other STEP 2 Position door side flashings and 0 945m top and bottom flashings and assemble door as shown ensuring narrow face o...

Page 9: ...et to the Top Plate 2 clouts per pan see fig 1 Standard Shed Bottom Plate will protrude be low wall sheet by approximately 10mm Raised base plate shed Wall sheet will protrude below the Bottom Plate b...

Page 10: ...using two clouts per pan STEP 4 Nail the wall sheets to the Bottom Plate at each end ensuring that each side of the wall sheets overhangs the Bottom Plate by 15mm and that the distance between the Top...

Page 11: ...nsure that the top of the sheets are flush with the top of the Top Plate and that the sides of the wall sheets overhang the Top Plate by 15mm as shown Nail wall sheets to Top Plate two clouts per pan...

Page 12: ...2 per join screw the Top and Bottom Plates together in the corners STEP 2 Repeat Step 1 with the second Side Panel ensuring that the Side Panel overlaps the Back Wall Panel STEP 3 Stand up the Front...

Page 13: ...RIDGE BEAM fig 2 fig 3 15mm JACK STUD RIDGE BEAM TOP PLATE ROOF SHEET STEP 2 Position the first Roof Sheet so that the top of the sheet is at the centre of the Ridge Beam and the side of the sheet ove...

Page 14: ...eet over hangs the end of the Ridge Beam and the Top Plate by 15mm Ensure the Ridge Beam and the Top Plate are straight Nail screw 4 x corners of the Roof Sheet as shown ensuring the ribs on the Roof...

Page 15: ...ORROSION AND COULD THEREFORE VOID THE WARRANTY FIT PADBOLT Rivet Padbolt to door and keeper onto Door Jamb as shown 14 YOUR DURATUF SMART STORE SHED IS NOW COMPLETE RELAX FRONT BASE PLATE BACK BASE PL...

Page 16: ...s less than 200g m2 as published by Branz Warranty certificate being returned to manufacturer within 21 days of purchase together with proof of purchase This warranty does not cover the following Fast...