ROOF ASSEMBLY
SELECT:
3 x 2.200 m Roof Sheets
1 x 1.555 m Spouting
2 x 2.200 m Barges
16 x 50mm Roofing Screws
24 x Rivets
4 x 50mm Clouts
12
IMPORTANT
Use 50mm Clouts only on outside ribs covered by Barge flashings. Predrill
holes using a 3.5mm drill bit. Use Roofing Screws on all other ribs. Ensure
screws are not overtightened as this can damage the seals and cause the shed
to leak.
STEP 1:
•
Ensure Shed is sitting level and square.
•
Lay Roof Sheets on the Top Plates.
•
Rivet sheets together at overlaps with 2 x rivets per join
.
STEP 2:
•
Position the Roof Sheets with front overhang of 130mm at each
end (
fig. 1
).
•
Using 4 x 50mm Clouts, predrill and nail the Roof Sheets to the Top
Plates through the ribs, at each corner, ensuring ribs on the Roof
Sheets line up with ribs on the Wall Sheets (
fig.2
).
STEP 3:
•
Ensure the Front and Back Top Plates are straight.
•
Screw the roof sheets to the front & back Top Plates, using 1 x
Roofing Screw per rib. (
fig.2
).
STEP 4:
•
Place barge flashings on roof at end of shed ensuring the diagonal
trimmed end is at the front. (See diagram on pg 5)
•
Rivet the Barge Flashings to the roof and the side wall, using four
rivets on top of barge and four into the side (
fig.3
).
Pan
Rib
fig.2
SIDE
WALL
FRONT
WALL
BACK WALL
SIDE
WALL
BOTTOM PLATE
TOP PLATE
130mm
fig.1
130mm
fig.3
X 4
X 4
Barge
Spouting
fig.4
STEP 7:
•
Place spouting in position and rivet to Barge Flashings at each end
and rivet to roof sheets (1 rivet per 1 sheet)
(fig.4).
IMPORTANT—FOR SHEDS WITH OPTIONAL CLEAR ROOF PANEL
Assemble as below, making sure that the Clear Roof Sheets overlap the stand-
ard roof sheets on both sides. Pre drill and fasten with the 50mm roofing
screws provided.
Ensure screws are not overtightened as this can damage the
seals and cause the shed to leak.
Summary of Contents for SM1520
Page 1: ...ASSEMBLY INSTRUCTIONS SM1520 BASE SIZE 1 520m x 2 020m ...
Page 2: ......
Page 15: ......