background image

12 |

INSTALLING YOUR SMART BOARD 685IX PREMIUM INTERACTIVE 
WHITEBOARD SYSTEM (APPLIANCE-BASED)

4. Using a Phillips No. 2 screwdriver, insert a bolt through the left pen tray bracket 

into the left captive nut in the wall mount. Repeat with the right pen tray bracket.

NOTE

Don’t tighten the bolts at this time. Leave them loose so that you can slide the 
interactive whiteboard sideways to align it with the projector’s image. See 

Aligning your interactive whiteboard with the projector

 on page 12.

5. Connect the USB cable from the SMART Hub to the interactive whiteboard 

controller module’s captive USB cable.

Completing your installation

Refer to the following procedures to finish installing your interactive whiteboard 
system.

Aligning your interactive whiteboard with the projector

To align your

interactive whiteboard

with your projector

1. Plug the projector’s power cable into a wall 

outlet, and then use the remote control to turn 
on the projector.

2. Follow the procedures in the 

SMART Board 

685ix Interactive Whiteboard System 
Configuration and User’s Guide,

 document 

99-00984-20, to align the projector.

3. Slide the interactive whiteboard from side to 

side, while holding the bottom frame of the 
interactive whiteboard, to center the board on 
the projected image.

4. Tighten the bolts holding the pen tray brackets 

to the wall mount.

Summary of Contents for 685ix

Page 1: ...SMART Board 685ix Premium Interactive Whiteboard System Appliance Based Installation on the FUWM 600 Wall Mount...

Page 2: ...ce in which case the user will be required to correct the interference at his own expense Trademark notice SMART Board the SMART logo and smarttech are trademarks or registered trademarks of SMART Tec...

Page 3: ...de could result in personal injury or product damage Two people are required to safely mount your interactive whiteboard or projector on a wall mount because they might be too heavy for one person to...

Page 4: ...s a USB compliant interface and that bears the USB logo In addition the USB source computer must be compliant with CSA UL EN 60950 and bear the CE mark and CSA and or UL mark s for CSA UL 60950 Other...

Page 5: ...your SMART Board 685ix interactive whiteboard system on a FUWM 600 wall mount 3 Important 3 Tools required 3 Installing the projector mount and wall mount bracket 4 Installing the SMART Hub SE240 SE2...

Page 6: ...7 Waste Electrical and Electronic Equipment regulations WEEE directive 17 Restriction of Certain Hazardous Substances RoHS directive 17 Packaging 17 China s Electronic Information Products regulations...

Page 7: ...600 SE240 VE220 installation instructions included with the wall mount document 99 01032 20 to install the wall mount In this chapter Refer to these topics for information about mounting your SMART Bo...

Page 8: ...ve whiteboard system Environmental requirements Before installing your system refer to the environmental requirements in the SMART Board 685ix Interactive Whiteboard System Configuration and User s Gu...

Page 9: ...on either side of the screen supporting its weight at the bottom corners while balancing the top with your other hands Do not leave cables on the floor where they can be a tripping hazard If you must...

Page 10: ...own on page 27 of the FUWM 600 SE240 VE220 installation guide To install the projector mount 1 Using a Phillips No 2 screwdriver insert four screws into the four top right holes of the projector suppo...

Page 11: ...he security cable to the bottom of the projector support To install the wall mount bracket Using a Phillips No 2 screwdriver secure the wall mount bracket to the wall mount with the included screws IM...

Page 12: ...s power supply cable and the USB cable to the hub 2 Route the cables behind the hub and then through a hole in the lower frame of the wall mount Route the USB cable through a hole near the bottom rig...

Page 13: ...and the female end of the power cable to the left of the clip leaving enough length to connect to the projector s connectors NOTE Don t let the cables cross as they pass through the clip 3 Close the w...

Page 14: ...stall the interactive whiteboard The following procedures show the main speaker mounted to the right of the interactive whiteboard which maintains the correct left to right stereo image If control acc...

Page 15: ...previous procedures and ensure that all cables are routed through openings in the sides or bottom of the wall mount frame Installing the UX60 projector WARNING Two people are required to safely mount...

Page 16: ...Securing the cables Before you mount the interactive whiteboard on the wall mount secure the cables to prevent strain on connectors and to keep excessively long cables hidden behind the interactive wh...

Page 17: ...ds of the cable through the notches in the track leaving the ends hanging near each end of the bottom frame Mounting the interactive whiteboard Follow this procedure to mount your SMART Board 685 inte...

Page 18: ...ontroller module s captive USB cable Completing your installation Refer to the following procedures to finish installing your interactive whiteboard system Aligning your interactive whiteboard with th...

Page 19: ...pansion slot and gently push down until it snaps into place Installing the pen tray To install the pen tray 1 Position the pen tray in line with the two L shaped metal brackets and then slide it towar...

Page 20: ...the following procedure your UX60 projector doesn t turn on or off when you press the control module s Power button on your SMART Board interactive whiteboard s pen tray To select the State Report op...

Page 21: ...orient it with other connected computers To orient your interactive whiteboard system 1 Press both pen tray buttons on your SMART Board interactive whiteboard simultaneously The SMART Hub SE240 Setti...

Page 22: ...16 INSTALLING YOUR SMART BOARD 685IX PREMIUM INTERACTIVE WHITEBOARD SYSTEM APPLIANCE BASED...

Page 23: ...onic product when it has reached end of its life If you require further information please contact your authorized SMART reseller or SMART Technologies for information on which recycling agency to con...

Page 24: ...oducts SMART Technologies products fall under this classification and meet the requirements for China s EIP regulations U S Consumer Product Safety Improvement Act The United States has enacted the Co...

Page 25: ...efore contacting SMART Technical Support Your local reseller can resolve most issues without delay NOTE To locate your local reseller visit www smarttech com wheretobuy All SMART products include onli...

Page 26: ...ranty that shipped with the SMART product at the time of purchase Registration To help us serve you register online at www smarttech com registration Address SMART Technologies 3636 Research Road NW C...

Page 27: ......

Page 28: ...Toll Free 1 866 518 6791 U S Canada or 1 403 228 5940 www smarttech com...

Reviews: