background image

Ultrafiltration system 

Instruction manual EN 

Contents 

1. Unpacking 
2. Scope of supply 
3. Insertion of the membrane 
4. Connecting the lines 
5. Installation 

6. Technical data 
7. Fist commisioning 
8. Consumables 
9. Filter change 
10. Filter change 
11. Filter order 

Summary of Contents for UF 2000

Page 1: ...nstruction manual EN Contents 1 Unpacking 2 Scope of supply 3 Insertion of the membrane 4 Connecting the lines 5 Installation 6 Technical data 7 Fist commisioning 8 Consumables 9 Filter change 10 Filter change 11 Filter order ...

Page 2: ...l first have to remove the safety clamp On the connector you will see a small white plastic ring Push it evenly in the direction of the connector and simultaneously pull the hose 1 Unpacking Remove all packaging material Make sure that the reverse osmosis system does not show any external damage 2 Scope of supply 1 smardy UF 2000 2 Water tap 3 Key for membrane housing 4 Hose line 5 Ultrafiltration...

Page 3: ...tion of the membranes Remove the hose from the membrane housing Unscrew the cover from the membrane housing Tool Key for membrane housing Then first insert the membrane the housing up to the stop Srew the cover back on to the membrane housing Insert the hose back into connector Insert filters 4 5 and 6 Tool key for filter housing Water inlet Membrane flush valve Rinsing water drainage Water armatu...

Page 4: ...pcock Then screw the stopcock into the lateral screw opening of the water connection component On the other side of the connector for the water supply screw the cold water pipe back on Now remove the nut from the cockstop and put it over the white hose which supplies the osmosis system with tap water Then put the white hose onto the stopcock the hose has to be put over the protruding ring Screw th...

Page 5: ...5 Screw the lock nut onto the threaded rod and screw down the water tap 6 Then take the blue hose and put the nut over the hose 7 Take the sleeve and put it onto the hose 8 Subsequently take the insert sleeve and stick it into the hose 9 Now insert the hose into the inner line of the threaded rod and then screw the nut onto the threaded rod 6 Technical data Dimensions 40cm x 13cm 43cm LxWxH Daily ...

Page 6: ...to protect the system against nocturnal pressure surges 7 First commissioning Before you open the water supply please double check all the hose lines These must have been laid absolutely free of kinks 8 Consumables For your system you need the following replacement filters and membranes item N Description Change interval Daily output up to 2000 L N 4 Activated carbon block filter Every 6 months N ...

Page 7: ...or the compliance with applicable rules 10 Filter change Recommended change interval N 4 6 months N 5 6 months N 6 6 months N 9 12 months N 10 24 months Date oN 4 Activated carbon block filter oN 5 granular carbon filter oN 6 Sediment filter oN 9 Activated carbon afterfilter oN 10 Ultrafilter membrane Date oN 4 Activated carbon block filter oN 5 granular carbon filter oN 6 Sediment filter oN 9 Act...

Page 8: ...11 Filter order smardy Robert Bosch Str 6b 86830 Schwabmünchen Germany info smardy de Link for accessories https www amazon co uk dp B06Y16H1NM ...

Reviews: