Step 2: Adjust both left and right sprockets where by the white
colored labels are facing towards the back end of equipment.
Step 3: Install the Direction Turning Chain, the white colored label
and the label on right sprocket should align, install entire
chain and the second label should also align to the corres-
ponding label on the left sprocket. Turn Buckle Head should
be facing towards the back end of equipment.
White colored labels
oriented in this position
Left
sprocket
Right
sprocket
Turn Buckle
Head
Right
sprocket
This white
colored label
should align
to the
corresponding
label on the
right sprocket
Second label
40
Summary of Contents for SC107
Page 1: ...SC107 Core Knee Service Manual...
Page 3: ...CH1 Serial Number Location 1...
Page 10: ...CH4 Specification and Assembly Guide 8...
Page 11: ...9...
Page 12: ...CH5 Console and Program Description 10...
Page 13: ...11...
Page 14: ...12...
Page 15: ...13...
Page 16: ...14...
Page 17: ...15...
Page 18: ...16...
Page 19: ...17...
Page 20: ...18...
Page 21: ...19...
Page 22: ...20...
Page 23: ...21...
Page 24: ...22...
Page 25: ...CH6 Engineer Mode Model Setting Mode Setting 23...
Page 26: ...24...
Page 27: ...25...
Page 28: ...26...
Page 29: ...27...
Page 49: ...V Wires and Parts Diagram 1 Wires and Parts connection diagram 47...