SMA America, LLC
Configuring the Sunny Boy
Installation Guide
SB20_25_30HFUS-eng-IUS113711
35
5.2.3 Closing the Quick Module
1. Close the lid of the Quick Module and flip the flap
down.
☑ The Quick Module is closed. You can now mount the Quick Module to the Sunny Boy, as
described in section 5.3 ”Mounting the Quick Module” (page 35).
5.3 Mounting the Quick Module
1. If the Sunny Boy is already operating:Disconnect the Sunny Boy from voltage sources
(see section 8.1 ”Disconnect the Sunny Boy from Voltage Sources” (page 65)) and open the
SMA DC Disconnect (see section 8.2 ”Open SMA DC Disconnect” (page 66))
2. Plug the Quick Module into the designated holes on the bracket until it snaps into place.