10 Commissioning the Inverter
SMA Solar Technology AG
Replacement Manual
STPxxx-60-DC-SPD-RM-xx-11
20
4. Loosely tighten the 5 M6x16 screws between the
cover of the cable compartment and the left
enclosure lid.
5x
5x
5. Tighten all 9 screws of the enclosure lid (TX30, torque: 4.3 Nm).
6. Recommission the inverter (see Section 10, page 20).
10 Commissioning the Inverter
Requirements:
☐ All cables must be correctly connected.
☐ Unused enclosure openings must be sealed tightly with sealing plugs.
Procedure:
1. Close the cable compartment and tighten the screws
on the cable compartment cover (TX 30, torque:
4.3 Nm).
2
2x
2x
1
2. Connect the assembled DC connectors to the inverter.
☑ The DC connectors snap into place.
3. Ensure that all DC connectors are securely in place.
4. Switch on all 4 DC load-break switches.
4x
4x
ON
OFF
ENGLISH
Summary of Contents for STP 110-60
Page 65: ...1 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 65 1 5 1 6 X703 1 X703 6 10...
Page 68: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 68 5 5...
Page 69: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 69 DC DC AC DC 1100 V...
Page 70: ...2 SMA Solar Technology AG STPxxx 60 DC SPD RM xx 11 70 DC 5 C v v...
Page 221: ......
Page 222: ...www SMA Solar com...