
6 Commissioning
SMA Solar Technology AG
28
SPW-WebconPB-IA-en-10
Installation Manual
6.4 Plant Registration in Sunny Portal
6.4.1 Registering a Small Plant in Sunny Portal
Requirements:
☐ The small plant must be commissioned (see Section 6.2).
☐ The inverter with Piggy-Back must be in feed-in operation.
☐ The plant must be connected to a router with permanent Internet connection (see router manual).
☐ PIC and RID must be available for the Piggy-Back.
☐ Your computer must have an Internet connection.
☐ JavaScript must be activated in the Internet browser.
Starting the Plant Setup Assistant in Sunny Portal
The Plant Setup Assistant is a step-by-step guide of the processes required for user registration and the
registration of your plant in Sunny Portal.
1. Open
www.SunnyPortal.com
.
2. Select [
Plant Setup Assistant
].
☑ The Plant Setup Assistant opens.
3. Follow the instructions of the Plant Setup Assistant.
Maximum permissible number of devices for a small plant in Sunny Portal
In Sunny Portal you can manage several plants. A maximum of four inverters with integrated
Piggy-Back is permissible per small plant.
Small plant with Piggy-Back cannot be combined with other plants
If you have already registered a plant in Sunny Portal with another communication device,
e.g. Sunny WebBox, you will still need to create a separate small plant with Piggy-Back. It is
not possible to combine the Piggy-Back and other communication devices within one plant in
Sunny Portal. Sunny Portal treats the existing plant and the new small plant with Piggy-Back as
separate plants.
• Create a new small plant with Piggy-Back.