Sunny Boy 2500U
Installation and Operator’s Manual
SB2500U-11:NE
-
7
-
SMA Regelsysteme GmbH
2 Installation
WARNING
: Before installing the Sunny Boy, read all instructions and cau-
tionary markings in the technical description and on the Sunny Boy and
the photovoltaic array.
WARNING
: All electrical installations shall be done in accordance with all
local electrical codes and the National Electrical Code (NEC),
ANSI/NFPA 70.
WARNING
: Connecting the Sunny Boy to the electrical utility grid must
only be done after receiving prior approval from the utility company and
performed only by qualified personnel.
2.1 What Must Be Done in Case of Transport Damages?
The Sunny Boy inverters are thoroughly checked before they are shipped. Even
though they are delivered in a sturdy packaging (which can be recycled) the inverters
can be damaged which is the forwarding company’s fault in most cases.
Please inspect your inverter thoroughly after it is delivered. If any damages can be
detected on the packaging that could lead to the conclusion that the contents is dam-
aged or if you detect that the inverter is damaged please immediately notify the for-
warding company.
SMA or your local supplier can help you in this matter. In any case the declaration of
transport damage must be made within 6 days upon receipt of the product and must
be stated in writing directly to the forwarding agent. If it is necessary to return the in-
verter to the manufacturer please use the packaging the inverter was sent in.