5 Preparation for Mounting
SMA Solar Technology AG
Installation Manual
13
SCCP-JP_NR-IA-en-11
5
Preparation for Mounting
Provide storage facilities prior to the start of assembly work
Storage facilities for the enclosure parts must be provided prior to the start of the assembly work. Make sure that
the enclosure parts, seals and screws are not damaged during storage.
5.1
Additionally required mounting material
The tools and materials indicated in this section must be provided by the customer.
The following tools and materials are required for the assembly work:
☐ Torque wrench with TX attachment (TX 30)
☐ Torx screwdriver (TX 30)
☐ Storage location for enclosure parts (e.g. padded storage cart)
☐ Torque wrench (socket wrench size 13)
5.2
Disconnecting the Inverter
The inverter must be disconnected prior to the disassembly of the rear panel.
DANGER
Danger to life from electric shock due to live voltage
High voltages are present in the live components of the product. Touching live components results in death or
serious injury due to electric shock.
• Wear suitable personal protective equipment for all work on the product.
• Observe all warning messages on the product and in the documentation.
• Switch the inverter off (see inverter installation manual).
• After switching off the inverter, wait at least 15 minutes before opening it to allow the capacitors to discharge
completely.
• Disconnect the inverter from the voltage source (see inverter installation manual).
Summary of Contents for CP-JP Series
Page 28: ...www SMA Solar com...