Attach guy lines AA, BB, CC, DD, and EE to internal rings.
Additional interior guy lines are recommended
as wind speeds or snow loads increase.
KD set up
(Internal Guy Lines)
E
E
A
B
A
B
C
C
D
D
If needed, internal guy lines
can be added
(view from interior)