
27
6461
2
2022
-
SPS-B
Hydraulic Installation
Accumulator tank
All stabilizer systems have accumulator tanks. The main purpose of the accumulator is to create additional capacity and quicker response to the
stabilizing system. It also has a pulse dampening effect for the system.
For Nitrogen(N2) fi lling and testing procedure - see HYDAC manual. (Accumulator tank supplier) Bladder charge pressure - 45bar.
Base kit (Filling kit) - 321308 covers these countries: Austria, Belgium, Check Republic, Denmark, Finland, Germany, Netherlands, Norway, Poland,
Sweden, Switzerland.
For other countries, additional adapters must be used, see HYDAC manual for the correct adapter.
MC_0217
IMPORTANT
Due to logistic reasons most accumulator tanks are shipped without nitrogen(N2) (if nothing else is agreed when the order was placed) in the
pressure bladder in top of the accumulator tank. Therefore, make sure to fi ll the tank or check the pressure before startup according to the
accumulator tank manual.
MG_0227
Accumulator
Pressure filter
WARNING
Running the system without
any nitrogen/pressure on the
tank will damage the stabilizer
system.
Hydraulic Installation
Main Valve Unit
The following functions and ports are integrated into the Main Valve unit:
(1) - Accumulator Unloading Valve
(2) - LS-V: Load sense from Tank-mounted valve unit
(3) - PC: Pressure to Cooling Pump
(4) - Cooling Pump ON/OFF valve
(5) - Feed from Main Pump(s) ON/OFF
(6) - P-AC: Pressure from AC Pump
(7) - P-MAIN: Pressure from Main Pumps
(8) - T: Return to Return Combiner
(9) - LS-P: Load sense to Main Pumps
(10) - Manual Unloading Valve
(11) - P-STAB: Pressure to Fin Valve Units
Refer to system drawings for details
MC_0217
IMPORTANT
During normal operation, the manual unloading valve has to be fully closed (tightened clockwise).
MG_0228
6
5
7
4
10
11
3
9
2
1
8