Sleipner 7070969017619 User Manual Download Page 8

8

6752

2

2021

-

PPC

MG_0379

 21

2685

9

2020

-

SE IP 80 & SE IP 120

MG_0035

A2

A

1

Fu

se

re

d

gr

ey

bl

ue

bl

ac

k

gr

ey

bl

ue

br

own

re

d

12

32

i

El

ec

tr

on

ic

con

tr

ol

 b

ox

Th

er

m

al

sw

itc

h

Ba

tt

er

y

12

V

or

24

V

Ba

tt

er

y

m

ai

n

sw

itc

h

M

4

3 2 1

3

4

2

1

8

6

9

5

re

d

re

d

bl

ac

k

7

whi

te

NB! 

Make sure to not use

any electronic interface

box (delay box) older than

the 6 1232i (ex. 6 122x)

on SP75Ti, SP95Ti, and

SP125Ti.

NB! 

Make sure to not use 

any electronic interface 

box (delay box) older than 

the 6 1232i (ex. 6 122x)

NB! Very important to check the following with mainswitch 

   position:

  After all electrical connections have been completed check with an 

  ohm meter that there is no electrical connection between electro- 

  motor body and positive terminal on the motor and between the  

  electromotor body and the negative (A1) terminal on the motor.  

  If you feel unsure on how to perform this check, contact skilled  

  personnel for guidance. 

22

2685

9

2020

-

SE IP 80 & SE IP 120

MG_0036

M

Th

er

m

al

sw

itc

h

El

ec

tr

on

ic

inter

fa

ce

 b

ox

123

2i

A

2

A

1

pi

n

AM

P

co

nn

ec

to

r

O

M

ot

or

4

2

1

3

Fu

se

Ba

tt

er

y

m

ai

n

sw

itc

h

1

5

4

2

6

8

9

re

(+

)

gr

ey

(s

ig

 +

)

bl

ue

(s

ig

 +

)

bl

ac

(-)

re

d

gr

ey

(s

ig

 -)

bl

ue

(s

ig

 -)

br

ow

n

3

red

Fu

se

d

in

si

de

 

1A

bl

ac

k

7

w

hi

te

NB! 

Make sure to not use

any electronic interface

box (delay box) older than

the 6 1232i (ex. 6 122x)

on SP75Ti, SP95Ti, and

SP125Ti.

NB! 

Make sure to not use 

any electronic interface 

box (delay box) older than 

the 6 1232i (ex. 6 122x)

20

5246

8

2020

-

SEP 250 & SEP 300

   

Control Panel Cable Installation 

EN

•   All Sidepower control panels can be used in any combination. 

•   All control panels can be installed using:

 

• Y-connectors - for standard on/o

  

• T-connectors - for S-link proportional power system. 

(NB: If two or more control panels are operated at the same time in opposite directions, the electronic control box will stop the thruster until 

it receives a single signal or thrust in one direction.)

See the Control pannel manual for more information.

MC_0041

!

 Please refer to the graphic for special considerations relating to your model 

!

MG_0061

-

-

(SEP model)

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

-

black

black

+

red

B+

+

red

B+

black

+

red

B+

-

+

B+

-05M

-05M

5A

+12/24

5A +12/24

PPC

PJC 212

Proportional

joystick

control panel

Bow and stern

Station 1

 

 

S-

PJC 212

Observe PPC battery 

terminal polarity !

S-

S-

+12/24V

5A

S link on/off

switch

red

ye

llo

w

bl

ack

12/24V

12/24V

Stern thruster

battery

Bow thruster

battery

Bow thruster

Stern thruster

(SEP model)

black

red

B+

black

red

Fixed multicable 5m/ 6 1280

5A

+12/24

5A +12/24

PPC

Proportional

Power Controller

Proportional

Power Controller

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

Automatic Main Switch

8977 12 / 8977 24

or

Manual main switch

w/ANL fuse

link control system

End terminator

End terminator

link supply

link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

S-link external

switch interface

and remote

(optional)

Proportional

joystick

control panel

Bow and stern

Station 2

8730

8730

Fixed multicable 5m/ 6 1280

18

2728

10

2020

-

SEP 80 & 100 & 120 & 130 & 150

MC_0035

Thruster Electrical Installation

EN

!

 Please refer to the graphic for special considerations relating to your model 

!

WARNING 

Check the following with the main switch is set to o

  :

After all electrical connections have been completed check with an ohm meter that there is no electrical connection between 

1. electro-motor 

 ange and the positive terminal on the motor 

2. electro-motor 

 ange and the battery negative terminal on the motor 

If unsure contact skilled personnel.

1.  Information of electrical table. 

see next page

- All power cable lengths represent the total length of the combined (+) and (-) cables.

- Battery capacity is stated as minimum cold crank capacity, (CCA).

- Use slow fuse rated to hold stated Amp-Draw for min. 5 minutes.

2.  Use appropriate sized cables and batteries with high cranking capacity to feed the thruster. The actual voltage at the motor while running the 

thruster decides the motors output RPM and thrust. Use larger cables and stronger batteries for better results.

3.  Connect the battery supply to the control unit (PPC).

 

- Install a main manual/ automatic switch from the positive lead terminal on the battery PPC unit). The main switch must be accessible to turn  

 

o

  the thruster independently from the rest of the electrical operation of the vessel when not onboard or in emergencies. 

(NB: It is advised  

 

to install a fuse on the positive cable for protection against short-circuiting of the main cables. The fuse should ensure no voltage  

 

decrease, slow-blow and sized to take the amperage draw for at least 5 minutes.)

 

 

- A circuit breaker can be used instead of the fuse and main power switch If the functionality is the same.

 

(NB: For Ignition Protected installations remember to use ignition protected fuses and switches if fi

 tted in areas that require this feature. 

Ensure to follow your national regulations)

6.  Fasten cables to the required torque. 

MG_0021

PPC

Battery

12V or 

24V

Proportional Power Controller PPC

Fuse

Manual or automatic

Main switch

4x

Min

200mm

Min

100mm

Min

100mm

Min 150mm

Fixed multi cable 5m/ 6 1280-05M

Motor

S-link control cables

IMPORTANT

The Proportional Power Controller is a bulkhead (wall) 

mounted unit and must be installed in a dry and 

well-ventilated compartment. The unit also requires a 

200mm minimum head clearance, 150mm minimum 

bottom clearance and a 100mm minimum clearance 

surrounding its remaining outer casing.

Hold in place 

for securing 

the end nut.

(M8) Nut

Tighten to *max 

13 Nm  (9.59 lb/ft)

(M10) Nut

Tighten to *max 

23 Nm  (16.96 lb/ft)

Spring 

washer

Lugs

IMPORTANT

Do NOT use washers between lugs, this 

causes overheating and fire. Spring 

washers must be placed in the outer 

position before tightening nut.

Multi-lug configuration

Ensure lug faces are 

back to back.

Spring 

washer

Nut

Nut

Lugs

Electrical Installation

EN

  

See the thruster manual supplied for the electrical installation

Summary of Contents for 7070969017619

Page 1: ...rway www sleipnergroup com DOCUMENT ID REVISION DATE LANGUAGE To download your language go to www sleipnergroup com 6752 2 K e e p t h i s m a n u a l o n b o a r d 2021 EN Including Installation For...

Page 2: ...ts according to DIRECTIVE 2013 53 EU DIRECTIVE 2014 30 EU DIRECTIVE 2014 35 EU MC_0020 Considerations and Precautions 3 PPC 520 Measurements 4 PPC 520 Technical Specifications 5 PPC 820 840 Measuremen...

Page 3: ...safety laws in accordance with their local outlined regulations classification rules Before installation it is important that the installer reads this guide to ensure necessary acquaintance with the...

Page 4: ...77 H W a b L MC_0340 PPC Measurements EN Measurement code Measurement description mm inch H PPC Height 226 8 9 W PPC width 190 7 5 L PPC length 143 5 6 a Minimum tunnel length 5 3 0 2 b Recommended tu...

Page 5: ...SEP 130 MC_0343 Technical Speci cations EN Supply Voltage 9 31V PPC 520 PPC 820 36 36V PPC 840 Output Voltage 20 100 x Vbatt Output Current Max 1000A PPC 820 Max 500A PPC 520 MAX 550A PPC 840 Regulati...

Page 6: ...Measurements EN Measurement code Measurement description mm inch mm inch H PPC Height 304 12 304 12 W PPC width 190 7 5 190 7 5 L PPC length 143 5 6 143 5 6 a Minimum tunnel length 5 3 0 2 5 3 0 2 b...

Page 7: ...are activated This removes any possibility for solenoid lock in Any fault in the main solenoids will give feedback to the panel and turn off power to the electric motor MC_0345 PPC Speci cations EN D...

Page 8: ...and remote optional S link external switch interface and remote optional Proportional joystick control panel Bow and stern Station 2 8730 8730 Fixed multicable 5m 6 1280 18 2728 10 2020 SEP 80 100 120...

Page 9: ...umber ie Thruster AMS PPC etc Bow Bow STB Stern Stern STB Fill in the type location and serial numbers of the S link devices installed Keeping this as a reference will make the setup procedure easier...

Page 10: ...Purchaser at the Warrantor s expense If on the other hand the claim is determined to result from circumstances such as described in section 4 above or a result of wear and tear exceeding that for whic...

Page 11: ...11 6752 2 2021 PPC MC_0037 Notes EN...

Page 12: ...ccuracies or omissions it may contain Continuous product improvement may change the product specifications without notice Therefore Sleipner Motor AS can not accept liability for any possible differen...

Reviews: