SLEIPNER MOTOR AS Side-Power Series Installation Manual Download Page 6

 6

Series / parallel switch box installation manual 

   

1.0.1 - 2018

Technical wiring diagram

























 































































































































   











FIG 4

Summary of Contents for Side-Power Series

Page 1: ...com Series parallel switch box 10112A SIDE POWER Thruster Systems Keep this m anualonboard Forthrusters SP155TC SP200TC SP220TC Series paralell switch box w softstart installation manual IMPORTANT NO...

Page 2: ...power a thruster or any other high power electric item The best and most easy way to solve the power feed to such sensitive and critical items is a small extra battery for this It is less expensive to...

Page 3: ...leads to the control side of the thrusters solenoid only Both batteries are now at 0V 12V Batt 1 12V SIDE POW ER M 24VDC Batt 2 12V SIDEPOWER Series paralell switch box Toenginestarter alternator char...

Page 4: ...rnthruster make sure to follow the instructions in the sternthruster installation manual to move the electronic controlbox away from the thruster and seal the thruster compartment from general bilge w...

Page 5: ...e alternator and or other charge device 12V Control cable 2 lead from box G r e y B la c k R e d All power cables between batteries box and thruster should be sized in accordance with the actual dista...

Page 6: ...6 Series parallel switch box installation manual 1 0 1 2018 Technical wiring diagram FIG 4...

Page 7: ...xes Drawing no S 9957 Date 16 08 1999 For charging use standard normal connections to battery bank 1 start battery bank Control lead to bow thruster Control lead to stern thruster Battery bank 2 Stern...

Page 8: ...e time it was published However Sleipner Motor AS can not accept liability for any inaccuracies or omissions it may contain Continuous product improvement may change the product specifications without...

Reviews: