
ENGLISH
18
3. AFFIXING THE TREE SLING AT FIXED-POINT 2
• Note for the 25/35/45 m SlackTivity Kits and 18 m Soft ’n Slack
Kits: Thread the first Express-Ring in the tree sling (see IV.).
• Wrap the tree sling around fixed-point 2; do so as described
in II.1.
Fig. 5
4. SETTING UP THE PULLEY SYSTEM FOR TIGHTENING
• Pick up the Slackline about
1 m (10/15 m SlackTivity,
10 m Soft ’n Slack) resp. 2 m
(25/35/45 m SlackTivity and
18 m Soft ’n Slack) from
second fixed-point 2 and
attach the single Slack-Ring
to the line by using the Slack-
Fig. 6
Locker principle (see Fig. 4).
click!
fixpoint 1
fixpoint 2
single Slack-Ring