ENCLOSURE ASSEMBLY
Make sure that you understand the information in the
box at the top of
page 13.
18
1
5
6
4
1 Screw Hole
for straight tube (5)
2 Screw Holes
for pole cap (1)
1. Lay one Straight Tube (5) with foam and one Curved
Tube (6) with foam (8) on the ground, insert the Straight
Tube(5) into the curved tube(6) end that contains only one
screw hole, secure with the screw(4).
Repeat this step to attach the seven remaining Straight
Tubes(5) and Curved tubes(6) together (not shown).
2
,
Inspect the attachments of the enclosure netting to the
trampoline mat (bed). Make certain each of the V-rings on
the trampoline mat (bed) is threaded through the
corresponding “buttonhole” in the netting.
2