M8 Bolt
(x2)
STEP 9
Upper Vertical
Tube
(x2)
U Shaped
Top Tube
(x1)
M8 Bolt
(x2)
M8 Nut
(x2)
7
8
10
11
Insert two upper vertical tubes
(7)
into U
shaped top tube
(8)
, secure with two M8
bolts
(10)
,
and
M8 nuts
(11)
.
11
STEP 10
Attach the assembled U shaped top tube section
(8)
to the long lower verti-
cal tube
(4)
, secure with two M8 bolts
(10)
,
and M8 nuts
(11)
.
M8 Nut
(x2)
10
11
(7)
(7)
(8)
(11)
(10)
(10)
(11)
(11)
(11)
(10)
(10)
Large hole faces
out
Large hole faces out