11
(9)
(9)
(8)
(6)
section 2
STEP 10
Side connection
joint
(x1)
Side connection
tube end
(x1)
8
6
Insert the side connection tube end
(6)
into the side
connection joint
as shown.
STEP 9
Batting cage
foot
(x2)
M8 Bolt black
(x2)
M8 Nut
black
(x2)
9
13
12
Attach two batting cage feet
(9)
to lower upright tubes from
previous step as shown, secure with M8 Bolts
(13)
and
M8
Nuts
(12)
.
You have now completed a section 2 frame piece
Repeat steps 7-9 to assemble one more section 2 frame piece.
(13)
(13)
(12)
(12)